Laserfiche WebLink
<br /> Table IV-I .-MOP planning steps, participants, status, and remaining work, <br /> Front Range Unit <br /> Planning steps Principal Status Remaining work <br /> participants and time required <br />1. I nitiate investigation USSR Completed <br />2. Inventory of resource Local, State Partially complete, Detailed inven- <br /> data, i.e., water Federal agencies except for current tory of current <br /> resources, lands, MOP team land use data. water avail. <br /> minerals, recreation ground-water pumping. ability <br /> facilities, environ- and individual irri- <br /> mental quality gation water use <br /> aspects. <br />3. Assemble basic infor- MOP team Complete. except for Initiate detailed <br /> mation concerning environmental environmental <br /> present conditions assessment (see assessment <br /> in the planning area No.2) (see No.2) <br /> from previous <br /> studies and current <br /> publications. <br />4. Identify critical MOP team, Preliminary data Problems and <br /> problems and needs Public Involvement assembled for prob- needs require <br /> by examining pro' Task Force lems and needs further refine- <br /> jected growth of ment and reiter- <br /> popu lation, indus. ation <br /> trial and municipal <br /> growth. <br />5. Compare critical needs MOP team Preliminary analysis- Additional hydro- <br /> with resources and hydrologic opera- logic model <br /> determine capability tions, engineering operation <br /> of resources to meet surveys, economic required to <br /> critical needs. studies pinpoint short- <br /> ages and oppor- <br /> tunities. Also <br /> additional land <br /> use and eco. <br /> nomic studies <br /> required. <br />6. Prepare preliminary MOP team Preliminary engineer- Major work <br /> solutions to criti- Public Involvement ing designs and required <br /> cal needs. incor. Task Force estimates of storage <br /> porating the various potentials, indivi- <br /> components in the dual reservoir <br /> planning process. operations <br />7. Solicit public opin- Public Involvement Preliminary ideas from Prepare maps and <br /> ion about tentative Task Force Public Involvement data-conduct <br /> solutions MOP team Task Force public meet- <br /> ings,seminars. <br /> etc. <br />S. Forrnu late preliminary MOP team Preliminary discussion Major work <br /> alternative plans about components for required <br /> based upon National plans meeting NED <br /> Economic Development and EQ objectives <br /> and Environmental <br /> Quality objectives <br />9. Prepare engineering, MOP team None Major work <br /> economic. environ- Contracts required <br /> mental, social Public Involvement <br /> assessments of all Task Force <br /> alternatives, and <br /> display for review <br /> by local, State, and <br /> Federal entities. <br />10. Formulate alternative MOP team None Major work <br /> plans and reiterate Contracts required <br /> the above planning Public Involvement <br /> steps to see if Task Force <br /> critical needs are <br /> being met and goals <br /> of governmental <br /> agencies are being <br /> satisfied. <br />11. Select and display MOP team None Major work <br /> recommended plan and Contracts required <br /> alternatives for Public Involvement <br /> review. Task Force <br />12. Prepare Feasibility USSR None Major work <br /> Report and Environ- MQPteam required <br /> mental I mpact State. <br /> ment <br /> IV-2 <br /> <br />