My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04119
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:49 PM
Creation date
10/12/2006 12:09:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.140.20
Description
Colorado River Basin Organizations and Entities - Colorado River Basin States Forum - California
State
CA
Basin
Colorado Mainstem
Date
7/1/1961
Author
Metro Water District
Title
Metropolitan Water District of Southern California - Twenty-Third Annual Report
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1%0 <br /> <br />r <br /> <br />1!/61 <br /> <br />I <br /> <br />, <br />, <br /> <br />I <br />r <br />l <br />~ <br /> <br />3S0a <br /> <br />FOREWORD <br /> <br />7 <br /> <br />CHRONOLOGY <br /> <br />- <br />.. .'" ~.... <br /> <br />(f'o}' ell 1'(JII"lfl!/!1 Ilri,,/, f.o .I1/}le 3fJ, 1 !J(iU. <br />Sf''.' })}"(.]I;OU...... A on Nfl! 't~('IJ{)rfs) <br /> <br />,July 29-Contract No, 759 completed-Chain link fence along <br />canal section of Second San Diego Aqueduct, <br /> <br />August 4-City of San Dimas incorporated in Pomona Valley <br />MWD, <br /> <br />October l5-Contract No, 782 completed-Relocation of a <br />portion of the Orange County Feeder at the Santa Ana <br />River Channel improvement. <br /> <br />November 10-City of Cudahay incorporated in Centra] Basin <br />MWD, <br /> <br />December I-Las Virgenes Municipal Water District annexed <br />to The Metropolitan Water District. <br /> <br />December 14-Calleguas Municipal Water District annexed <br />to The Metropolitan Water District. <br /> <br />December 23-Contract No, 748 completed-Construction of <br />230 KV transmission line between Hoover Dam and <br />Camino Station, <br /> <br />January l5-Contract No, 788 completed-Relocation of a <br />portion of the Santa Monica Feeder at the Ventura Free, <br />way location. <br /> <br />March l6-City of Oxnard annexed to Calleguas Municipal <br />Water District as "Annexation No, L" <br /> <br />April 7-Contract No, 729 completed-Enlargement of Lake <br />Mathews, <br /> <br />April 19-City of San Juan Capistrano incorporated-It lies <br />entirely within the boundaries of the Orange County Muni- <br />cipal Water District, <br /> <br />May l6-Contract No, 7:J5 completed-West Coast Feeder, <br /> <br />May 31-Contract No. 792 completed-Cottages and Garages <br />at four locations on Aqueduct, <br /> <br />June 8-Contract No, 789 completed-Welded Steel Wash <br />Water Tank at Softening and Filtration Plant. <br /> <br />June 12-Contract No, 798 completed-Asphalt concrete <br />pavement at each of the five pumping plants, <br /> <br />June 12-Contract No, 801 completed-Asphalt concrete, <br />pavement at each of the five pumping plant villages, <br /> <br />June l6-Contract No, 760 completed-East Orange County <br />Feeder, <br />
The URL can be used to link to this page
Your browser does not support the video tag.