Laserfiche WebLink
<br />l <br /> <br />3803 <br /> <br />FOREWORD <br /> <br />Fullertoll <br />Area exclusive of portion within OranJ.{l:' County l\lWD <br />Area within Orange Count). MWD. <br />Total area of City of Fullertoll.. <br /> <br />Glelldale <br />Area exclusive of portion within Foothill i\1WD.. <br />Area within Foothill l\1\VDmm <br /> <br />Total area of City of G1t'lldale.. <br /> <br />LOllU Beach <br />Area exclusive of portions within Central and West Basin <br />Area within Central Basin 1\1WD.. <br />Area within West Basin MWD.. <br /> <br />Total area of City of Lan,IC Bea~IL. <br /> <br />L08 Angeles <br />Area exclusive of portion within 'Vest Basin MWD.. <br />Area within \Vest Basin MWD.. <br />Total area of City of Los Angeles.. <br /> <br />PusodClI(f <br />Area exclusive of portion within Foothill I\1WD.. <br />Area within Foothill l\1WD.. <br /> <br />Total area of City of Pasadt'na.. <br /> <br />Santct- Ana <br />Area exclusiv\..' of portion wiLhill Orange County ]\fWD <br />Area within Orange County l\1WD.. <br /> <br />Total area of City of Santa Ana <br /> <br />l'u/"J"(jllce <br />Area exclusive of portion within West Basin l\1WD.. <br />Area within West Basin l\1WD__mumu <br /> <br />Total area of City of Torrance <br /> <br /> ,t '- <br /> '. <br /> " <br /> 16,78 <br /> 4,68 <br /> 21.46 <br /> 2H.333 <br /> 0,00:1 <br /> ~9.:n6 <br />MWD 40,57 <br /> 5.80 <br /> 0,04 <br /> 46,50 <br /> 456.39 <br /> 1.54 <br /> 457.93 <br /> 22,5l.i <br /> 0,04 <br /> 2~.60 <br /> 10,82 <br /> 11.94 <br /> 22.7G <br /> 18,88 <br /> 1.92 <br /> 20,80 <br /> <br />The distribution system originating at Lake Mathews was com- <br />pleted in the first development prior to 1D41 and consisted of 150 <br />miles of large diameter pipes and tunnels, four storage reservoirs <br />"nd the water treatment plant with a capacity of 100 million gallons <br />a day which was later enlarged to 200 million gallons a day capac- <br />ity, The treatment plant was named in honor of Mr, F, E. Wey- <br />mouth, the first General Manager and Chief Engineer under whose <br />direction the aqueduct was planned, designed, constructed and <br />operated, <br /> <br />E::cpantiio-n ProglY/.m <br /> <br />In 1D52 the District embarked upon a $220 million expansion pro- <br />gram to bring the aqueduct to its full delivery capacity of 1,605 <br />cubic feet per secund or u,"er one billion gallons of water a da\"". On <br />the Main Aqueduct this program included the construction of the <br />second harrel of 47 siphons, the installation of the six adrlitional <br /> <br />, <br />~ <br /> <br />, <br />