Laserfiche WebLink
<br />i <br />~f~ <br /> <br />::,.. <br />@~:.~:;.~. <br />~;,,".::,::<: <br />E7.)"~ .~ <br />,.'" -.0:- <br />(,;;;:;, <br />f'" , <br /> <br />:",~,~~JIf~~~~~~!~~l~~f~{f~l~l~iJg)~;~ <br /> <br />o lJ .i 2 8 t. 'tt~ .~~~~ <br />Status Period #9 <br />SUMMARY OF DATE -- RAINBOW BRIDGE <br />for period April 1977 throug:l September 1977 <br /> <br />WEATIlER (tal~an at Rainbow Marina Courtesy Dock WElather Station) <br /> <br />Air Temperature: <br /> <br />Maximum 970 <br />Minimum 410 <br />Average 720 <br /> <br />F on date 7~27-77 <br />F on date 4-2-77 <br />F for, this period. <br /> <br />Water Temperature: <br /> <br />Average 69.60 F for this period. <br /> <br />LAKE POWELL ELEVATIONS: Maximum 3;655.18 on date 7~15-77 <br />Minimum 3,636.70 on date 9-30-77 <br /> <br />Conclusions <br /> <br />The Rainbm, Bridge monitoring program conducted during the period October <br />1975 through September 1977 shows nO destructive effect occurring to <br />Rainbow Bridge or Bridge Creek Canyon from the incursion of Lake Po~ell <br />into the area. <br /> <br />Minor environmental modification by causes other than the lake waters <br />is occurring. <br /> <br />6 <br /> <br /> <br />,;fS~~~ii~~iii!i~~:~!j~t~fif~Z~i~t~:~, <br /> <br />(t)t~~ <br /> <br />~?/\!~ <br />~~~~ <br /> <br />;~::._",:;~.:.~ <br />r?;~~g~ <br />~ii;, <br />~~.~ <br /> <br />,.,..... :.t;,.~,: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />l-~~.~'>c1- <br /> <br /> <br />I <br /> <br /> <br />ii''>.''-:/;.... <br />I~ <br /> <br />