My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04095
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:43 PM
Creation date
10/12/2006 12:07:17 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8270.100
Description
Colorado River Basin Water Quality/Salinity -- Misc Water Quality
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1987
Author
USDOI
Title
Quality of Water - Colorado River Basin - Progress Report No. 13 - January 1987
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1. Ad zona <br /> <br />a. Miscellaneous Additional Depletions <br /> <br />Consumptive uses due to irrigation and stockpond evaporation <br />~ have increased by about 6,000 acre-feet since the Comprehensive Framework <br />'-l Study estimates were prepared. Municipal and domestic uses have increased by <br />~ about 6,000 acre-feet. It is expected that an additional 6,000 acre-feet will <br />~ be used for municipal purposes for the Navajo Indian Nation and for the city <br />of Page, Arizona. Water for Page is reserved by The Reclamation Development <br />Act of 1974, Public Law 93-493, which, among other actions, provided for the <br />incorporation of the city. <br /> <br />b. Navajo Powerplant <br /> <br />Consumptive uses according to records provided by the Navajo <br />Generating Station averaged 22,000 acre-feet over the 1980-85 period. The <br />contract for sale of water out of Lake Powell allows for annual uses of up to <br />34,100 acre-feet; however, present physical limitations preclude this level of <br />use. <br /> <br />2. ~oming <br /> <br />a. Miscellaneous Additional Depletions <br /> <br />Values used for 1985 represent additional depletions that have <br />developed since the Comprehensive Framework Study (1965 level) estimates were <br />prepared. These values and the projections to 2000 were provided by the <br />Wyoming State Engineer. <br /> <br />b. Seedskadee Project <br /> <br />Fontenelle Dam is the only feature of the project that has been <br />constructed. Irrigation facilities have not been built, and there are no <br />plans to reactivate studies to identify an irrigation project. Repairs now <br />underway at Fontenelle Dam will severely restrict storage capacity until the <br />expected completion date of 1989. <br /> <br />By contract of June 14, 1962, the State of Wyoming purchased <br />60,000 acre-feet of capacity in Fontenelle Reservoir. The United States <br />notified the State that the yield from the 60,000-acre-foot capacity would be <br />available on January 1, 1969. The State optioned 25,000 acre-feet to Sun Oil <br />Company and 35,000 acre-feet to Pacific Power and Light Company with 25,000 <br />acre-feet as firm supply and 10,000 acre-feet when available. <br /> <br />A second contract, dated December 27, 1974, was signed with the <br />state of Wyoming which would have yielded up to 125,000 acre-feet of <br />additional water for use in Wyoming. This additional yield was based on the <br />assumption that Reclamation's direct flow irrigation water right could be <br />converted to a direct flow municipal and industrial right. In 1983, the <br />Wyoming Supreme Court ruled, in another case, that the State Engineer does not <br />have the power to grant a change of use for unexercised rights. This has put <br />a cloud of doubt over what the ultimate yield of the reservoir will be. The <br />State Engineer is currently considering an application from Reclamation to <br />convert the large inactive capacity to active capacity. The outcome will <br />determine the scale of development and resulting yield that can be expected <br /> <br />VI-S <br />
The URL can be used to link to this page
Your browser does not support the video tag.