Laserfiche WebLink
<br />~ <br />C) <br /> <br />c <br /> <br />CC10~8do R~ve~ Bas~n Salini:v Cont~ol P=o~ect. ~~t:e <br />Unit (Colo"ado) <br /> <br />TT <br />.. , <br /> <br />Pa~adox Vallev <br /> <br />Fiscal Year 1988 <br />Fiscal Year 1989 <br /> <br />...................................... <br /> <br />S 11,383,000 <br />$ 7,704,000 <br /> <br />....................................... <br /> <br />The surface facilities for the injection well will be completed. Testing, <br />engineering, and seismic monitoring activities will continue as well as, <br />the purchase of lab and office equipment. A contract to construct the <br />East Paradox Cre~ Bridge will be awarded and completed. <br /> <br />Dallas Creek Particioating Proiect (Colorado) <br /> <br />Fiscal Year 1988 <br />Fiscal Year 1989 <br /> <br />...................................... <br /> <br />$ 8.500,000 <br />$ 198,000 <br /> <br />...................................... <br /> <br />Funds will provide for minor completion work. Filling of the reservoir <br />will continue. <br /> <br />Dolores ParticioatinF; Pro; ect ' (Colorado) <br /> <br />Fiscal Year 1988 <br />Fiscal Year 1989 <br /> <br />...................................... <br /> <br />$ 11.047,000 <br />$ 26.388,000 <br /> <br />...................................... <br />, ' <br /> <br />Cons~ruction work will con~inue on Pleasant View-Ruin Canyon~ <br />Hovenweep Pumping Plants and Laterals and the Programmable Master <br />Supervisory Controls System. Cultural resource and preconstruction <br />activities on McPhee Dam and Powerplant, Dove Creek, and Cortez-Towaoc <br />distribution systems will continue. Land acquisition for Towaoc Canal <br />will begin. Contracts will be awarded for Williams Draw Road: Dove Creek <br />~ Canal Reach III: Towaoc Canal Reach I: WAPA substation and transmission <br />facilities; Towaoc Canal Powerplant turbine, generator, and penstock: and <br />the supervisory control building. <br /> <br />FrvinF;pan-Arkansas Project (Colorado) <br /> <br />Fiscal Year 1988 <br />Fiscal Year 1989 <br /> <br />....................................... <br /> <br />$ 8.100,000 <br />$ 6,700,000 <br /> <br />.....................'................. <br /> <br />The program provides for completion of the fiber optics communications <br />system at the Mt. Elbert Pumped Storage Powerplant, cathodic protection on <br />Foun~ain Valley conduit, and cons~ruction of fish hatche=y ponds and f~sh <br />hatchery survey services. ~ork on Pueblo recrea~ion facilit~e5 ~ill <br />continue. A new cont"act will be awarded to "emove dikes f"om Twin Lakes <br />Dam and Reservoir. <br />