My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04088
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:41 PM
Creation date
10/12/2006 12:06:58 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
3/21/1988
Title
Agenda Item 10 Federal Water Project Appropriations for FY 1989
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />C) <br /> <br />c <br /> <br />CC10~8do R~ve~ Bas~n Salini:v Cont~ol P=o~ect. ~~t:e <br />Unit (Colo"ado) <br /> <br />TT <br />.. , <br /> <br />Pa~adox Vallev <br /> <br />Fiscal Year 1988 <br />Fiscal Year 1989 <br /> <br />...................................... <br /> <br />S 11,383,000 <br />$ 7,704,000 <br /> <br />....................................... <br /> <br />The surface facilities for the injection well will be completed. Testing, <br />engineering, and seismic monitoring activities will continue as well as, <br />the purchase of lab and office equipment. A contract to construct the <br />East Paradox Cre~ Bridge will be awarded and completed. <br /> <br />Dallas Creek Particioating Proiect (Colorado) <br /> <br />Fiscal Year 1988 <br />Fiscal Year 1989 <br /> <br />...................................... <br /> <br />$ 8.500,000 <br />$ 198,000 <br /> <br />...................................... <br /> <br />Funds will provide for minor completion work. Filling of the reservoir <br />will continue. <br /> <br />Dolores ParticioatinF; Pro; ect ' (Colorado) <br /> <br />Fiscal Year 1988 <br />Fiscal Year 1989 <br /> <br />...................................... <br /> <br />$ 11.047,000 <br />$ 26.388,000 <br /> <br />...................................... <br />, ' <br /> <br />Cons~ruction work will con~inue on Pleasant View-Ruin Canyon~ <br />Hovenweep Pumping Plants and Laterals and the Programmable Master <br />Supervisory Controls System. Cultural resource and preconstruction <br />activities on McPhee Dam and Powerplant, Dove Creek, and Cortez-Towaoc <br />distribution systems will continue. Land acquisition for Towaoc Canal <br />will begin. Contracts will be awarded for Williams Draw Road: Dove Creek <br />~ Canal Reach III: Towaoc Canal Reach I: WAPA substation and transmission <br />facilities; Towaoc Canal Powerplant turbine, generator, and penstock: and <br />the supervisory control building. <br /> <br />FrvinF;pan-Arkansas Project (Colorado) <br /> <br />Fiscal Year 1988 <br />Fiscal Year 1989 <br /> <br />....................................... <br /> <br />$ 8.100,000 <br />$ 6,700,000 <br /> <br />.....................'................. <br /> <br />The program provides for completion of the fiber optics communications <br />system at the Mt. Elbert Pumped Storage Powerplant, cathodic protection on <br />Foun~ain Valley conduit, and cons~ruction of fish hatche=y ponds and f~sh <br />hatchery survey services. ~ork on Pueblo recrea~ion facilit~e5 ~ill <br />continue. A new cont"act will be awarded to "emove dikes f"om Twin Lakes <br />Dam and Reservoir. <br />
The URL can be used to link to this page
Your browser does not support the video tag.