Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />..... ..... r- "~ <br />..\ jt , <br />,Juu-...J <br /> <br />Report of the Regional Director <br /> <br />cost would be for Western Slope structures and VIe trans- <br />mountain twmel. The annual operation, maintenance, and <br />replacement expense is estimated to be $1,335,200. <br /> <br />Feature Construction Ann ",,1 <br /> cost O.M.&R. <br />Dams and reservoirs $ 64, .334,000 $ .30,7bO <br />Di version canals and conduits 30,1199,000 b5,870 <br />Power features 34,021,000 84b,990 <br />Municipal supply systems 18,050,000 391,580 <br />O&M during Construction 53b,OOO 0 <br />'Total ~1117,440,000 ~1,3,,5,200 <br />- <br /> <br />Cost allocation <br /> <br />67. Construction costs have been allocated to the <br />various project functions through use of the alternative <br />justifiable expenditure method. That method utilizes the <br />estimated cost of the most economical substitute single- <br />purpose facility which would provide benefits equivalent <br />to those accruing in a multiple-purpose development. The <br />tentative allocation of construction costs and distribu- <br />tion of annual operation, maintenance, and replacement ex- <br />penses are as followsl <br /> <br /> Construction Annual <br />Function cost O.M.&R. <br />Irrigation U59,930,OOO ~ 76,080 <br />Power 40,032,000 854,050 <br />Municipal water 29,522,000 1105,070 <br />Total RETURNABLE $129,484,000 $1,335,200 <br />Flood control 15,777 ,000 (Included <br />Fish and lr.lldlife 2,179,000 Above) <br />Total NONRETURNABLE 17,956,000 --- <br />Total costs ~147,440,000 $1,335,200 <br /> <br />Project operation and return on investment <br /> <br />68. The plan of operation calls for the formation of <br />a water conservancy district, under the Colorado Water Con- <br />servancy District Act of 1937, as amended, which would con- <br />tract with the Government for payment of project services <br /> <br />R <br /> <br />23 <br />