My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04057
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:34:43 PM
Creation date
10/12/2006 12:06:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8410.200.60
Description
Basin Multi-State Organizations - Missouri River Basin Commission - Reports
Date
1/3/1974
Author
Weaver, Bicket
Title
Technical Report of the Federal Marketing and Pricing Group - Joint Federal-State Subcommittee Meeting
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />~ <br /> <br />2. :'edera1 M & I water marketing and pricing policies in other <br />areas of the United states (also appliea ble in the Hissouri <br />Basin). <br /> <br />, Recent Illustrative Water Charges. <br />water charges ($/~f.) in a recent <br />-projects were found to ,be about as <br /> <br />Service <br />Storage only <br />Conveyance only <br />Storage and conveyance <br /> <br />Range of charges <br />$32.60 - $5.40 <br />111.00 7.00 <br />110.00 5.60 <br /> <br />Municipal and industrial <br />analysis of Reclamation <br />follows: <br /> <br />, Med ian <br />$15.90 <br />23.55 <br />,30.00 <br /> <br />Quartile <br />Upper Lower <br />$22.00 $ 8.00 <br /> <br />43.00 <br /> <br />17.50 <br /> <br />Water ~~rketed from several 'Federal Reclamation projects for <br />municipal and industrial use is listed in the tabulation below. <br />Some'of the rates are based on providing water from storage while <br />others also include payment for water conveyance facilities. Some <br />rates given below are approximations for existing projects based on <br />required payments and estimated water deliveries, some are stated <br />rates in \vater service contracts, and some are estimated rate.s for <br />projects in the investigation.or construction stages. <br /> <br />Proj~~t ____ __ <br />Cachum" Projec l, CClliforIli.::t <br />Central Valley l'L'oject, Colifornia <br />f.ubllrn-Folso::l Sou th Uni t <br />Forest l!ill'Divide Area <br />Folsom-~.~olby /\rca <br />Folso'll-SoCltb C.::tn.::tl ,\1'0<1 <br />AubuITl or rolsom l~cservoir <br />(Hote: I'iost c:-:isti~z; r.:ltes arc <br />$9.00 at rcservoir or $10.00 <br />at canals ide) <br />Colorado I~ivcr Stol~nGc Project <br />(N.1i113ll..-:m rc.:.:t'r......oir) <br />Colll::lbus tcnd Proj cc t, Tex<1s <br /> <br />Fryingpan-Arkansas Project, Colorado <br />(Reservoir delivery) <br />"}lissouri River Basin Project <br />Garrison Diversion Unit, North Dakota <br />Nonnan Project, Okl~hol.l.3. <br />San Jrngclo Project, Texas <br />Southern Nevada Hater Project, Nevada <br />Walla Halla Project, Oregon-Washington <br />Touchet Division <br /> <br />Water Rate <br />($ p.<:r ac:re-[~otL <br />35.00 <br />56.00 <br /> <br />85.00 <br />32.00 <br />It..ao <br />9.00 <br /> <br />I <br />1 <br />, <br />, <br />, <br />I <br />! <br /> <br />7.00 <br />,10.85 <br /> <br />5.40 <br /> <br />19.15 <br />..31.00 <br />17.00 <br />30.00 <br /> <br />10.15 <br /> <br />Bureau of Reclamation rnarl:eting polic!.es are detailed on <br />Exhibit 1. <br /> <br />Lj <br />
The URL can be used to link to this page
Your browser does not support the video tag.