My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04050
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:28 PM
Creation date
10/12/2006 12:06:28 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.100.60
Description
Colorado River Basin Salinity Control Forum
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1979
Author
CRBSCF
Title
Third Annual Progress Report - Water Quality Standards for Salinity - Colorado River System - December 1979
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l\) <br />M:la <br />... <br />W <br /> <br />Nevada <br /> <br />The Clark County 208 Plan received conditional <br /> <br />approval by the EPA on July 2, 1979. The Plan indicated irriga- <br />tion system improvements in the Virgin and Moapa Valleys <br />would decrease salt loads to Lake Mead. An RCWP application <br />is being prepared to provide for delivery system improvements. <br />It is expected that the resulting improved irrigation effi- <br />ciencies will lead to a salinity reduction of 1.9 mg/l at <br />Imperial Dam, Benefit cost ratio for salinity reduction has <br />been calculated at 2:1. <br /> <br />Utah - The Uintah Basin 208 plan was conditionally certi- <br />fied by the State on September 12, 1978, and conditionally <br />approved by EPA September 27, 1979. The Talmadge area in <br />Duchesne County is one of two Utah Rural Clean Water Project <br />areas submitted to the NRCWP for evaluation and approval. An <br />agricultural assessment of the 208 area was completed for <br />purposes of the RCWP application. It is anticipated that <br />this assessment will be certified and approved with condi- <br /> <br />tions in the near future. <br /> <br />The Southeast Utah area summary Water Quality Management <br />Plan and Sub-basins Plans are being printed. It is expected <br />that the plan will be certified and approved by early 1980. <br />The Five-County 208 Plan has been partially updated <br />after receipt of the draft. The new material consists mostly <br />of a detailed agricultural assessment and new water quality <br />information. The plan should be certified by November 1979 <br />and approved by EPA by the end of the year, <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.