My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04046
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:27 PM
Creation date
10/12/2006 12:06:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.150
Description
Grand Valley Unit - Colorado River Basin Salinity Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/1/1982
Title
Monitoring and Evaluation Plan -- Colorado River Basin Salinity Control Program for Grand Valley Unit and Uinta Basin Unit, Utah -- PART II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t:::> <br /> <br />,. ,. F. Water budget process for each site. <br /> <br />II_~) <br />~ <br /> <br />t..:....' <br /> <br />1. Require crop consumptive use between irrigations. <br />a. EL-1 from irrigation guide prorate monthly cOlnsumptive use. <br />b. EL-2 computer computation. <br />c. EL-3 better equipment and programing. <br />d. EL-4 best equipment. <br />2. Initial soil moisture and how it affects irrigatiOlns. <br />a. EL-1 compute winter precipation effects on sOlil moisture <br />- how full is profile? Normally soil moisture at about 60% <br />of field capacity at end of October. Figure November & December <br />as rain with about 60% effective - entering soil. Figure Jan- <br />uary & February as snow with about 40% entering the soil. Figure <br />March & April as rain with about 40% entering soil because of <br />a wetter soil than in fall. <br />b. EL-2, EL-3. EL-4 figure froG! field investigation. <br />3. Final soil moisture. <br />4. Effective rainfall between irrigations. <br />a. EL-1, EL-2 - do manually. <br />b. EL-3, EL-4 - done by computer. <br />5. Gross water application. <br />6. Compute gross tailwater. <br />7. Deep percolation. <br />a. EL-1, EL-2 by manual calculator. <br />b. EL-3, EL-4 by computer. <br />8. Plot consumptive use. <br /> <br />56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.