Laserfiche WebLink
<br />00 <br />o <br /> <br />,HI' i'~ e l ~ .. <br />,_, '_' _'-0..)'1; <br /> <br />TABLE 6 - MANDAY REQUIREMENTS FOR EACH EVALUATION YEAR BY <br />MONITORING LEVEL AND EQUIPMENT LEVEL WITH ASSOCIATED <br />MANPOWER COST FOR Colorado <br /> <br />Moaitoring Level <br /> <br />3 <br /> <br />1 <br /> <br />Equipment Level <br /> <br /> Mandays per Mandays by evaluation year for <br /> site per Work Item No. 1 <br /> Method of irrigation evaluation Year 1 Year 2 Year N*, <br /> period No. of Man- No. of Man- No. of Man- <br /> sites days sites days sites days <br /> , <br /> All methods 2.50 ,50 125.00 16 40.00 16 40.0C <br />. Subtotal 125.00 40.00 40.0C <br /> Mandays per Mandays by evaluation year for <br /> site per Work Items No. 2, 3, and 4 <br /> Method of irrigation year Year 1 Year 2 Year N* <br /> No. of Man- No. of Man- No. of Man- <br /> sites davs sites days sites davs <br /> Border or semi-controlled flooding 19.25 6 115.50 6 115.50 6 115.50 <br /> Sprinkler or trickle 15.91 5 79.55 5 79.55 5 79.55 <br /> Furrow 19.25 39 750.75 39 750.75 39 750.75 <br /> Subtotal 945.8C 945.80 945.80 <br /> Total mandays 1070.80 1070.8( 985.80 '985.8e <br /> Cos~ pe" Manpower cost by evaluation year <br /> mandav <br /> Total Manpower Cost $100.00 $107080 $98580 $98580 <br />