Laserfiche WebLink
<br />--.J <br />'" <br /> <br />TABLE 6 - MANDAY REQUIREMENTS FOR EACH EVALUATION YEAR BY <br />MONITORING LEVEL AND EQUIPMENT LEVEL WITH ASSOCIATED <br />MANPOWER COST FOR Colorado <br /> <br />":llr"L~q <br />l. '- _ V.;O v <br /> <br />Monitoring Level ~_ <br /> <br />Equipment Level 4 <br /> <br /> Mondays per Mondays by evaluation year for <br /> site per Work Item No. 1 <br />Method of irrigation evaluation Year 1 Year 2 Year N* <br /> period No. of Man- No. of Man- No. of Man- <br /> sites days sites days sites days <br />All methods 2.50 ,10 25.00 3 7.50 3 7.50 <br />Subtotal 25.00 7.50 7.50 <br /> Mandays pel Mandays by evaluation year for <br /> site per Work Items No. 2, 3, and 4 <br />Method of irrigation year Year 1 Year 2 Year N* <br /> No. of Man- No. of Man- No. of Man- <br /> sites davs sites davs sites davs <br />Border or semi-controlled flooding 5.95 1 5.9: 1 5.95 1 5.95 <br />Sprinkler or trickle 18.06 1 18.0E 1 18.06 1 18.06 <br />Furrow 5.95 8 47.6( 8 47.60 8 47.60 <br />Subtotal 71.61 71.61 71.61 <br />Total mandays 96.6 79.11 79.11 <br /> cost; per Manpower cost by evaluation year <br /> mandav <br />Total Manpower Cost $100.00 $9661 $7911 $7911 <br />