Laserfiche WebLink
<br />..., <br />w <br /> <br />TABLE 6 - MANDAY REQUIREMENTS FOR EACH EVALUATION YEAR BY <br />MONITORING LEVEL AND EQUIPMENT LEVEL WITH ASSOCIATED <br />MANPOWER COST FOR Colorado <br /> <br />;"l~' 1 r., /1 ;",' <br />~~' .J J'i: I <br /> <br />Monitoring Level <br /> <br />1 <br /> <br />2 <br /> <br />Equipment Level <br /> <br /> Msndays per Mandays by evaluation year for <br /> site per Work Item No. 1 <br /> Method of irrigation evaluation Year 1 Year 2 Year N* <br /> period No. of Man- No. of Man- No. of Man- <br /> sites days sites days sites days <br /> All methods 2.50 .10 25.00 3 7.50 3 7.50 <br />. Subtotal 25.00 7.50 7.50 <br /> Mandays pel Mandays by evaluation year for <br /> site per Work Items No. 2, 3, and 4 <br /> Method of irrigation year Year 1 Year 2 Year N* <br /> No. of Man- No. of Man- No. of Man- <br /> sites davs sites days sites davs <br /> Border or semi-controlled flooding 25.81 1 25.81 1 25.81 1 25.81 <br /> Sprinkler or trickle 20.47 1 20.4/ 1 20.47 1 20.47 <br /> Furrow 25.81 8 206.4S 8 206.48 8 06.48 <br /> Subtotal 252.76 252.76 52.76 <br /> Total mandays 277.7 260.26 260.26 <br /> Cosl; per Manpower cost by evaluation year <br /> manda" <br /> Total Manpower Cost $100 $27776 $26026 $26026 <br />