Laserfiche WebLink
<br />- 9 . <br /> <br />among the participating projects fOr initial authorization. This project <br /> <br />is desperately nerded to provide a dependable water supply for lands <br /> <br />lying in the La Plata Valley and located in both Colorado and New 1jexico. <br /> <br />The limited and erratic water supply of the La Plata is apportioned be- <br /> <br />tween Colorado and New kexico by the La Plata River Compact. This compact <br /> <br />was recognized and approved by the Upper Colorado River Basin Compact. <br /> <br />The La Plata Project is of relativ~ly small cost and does not materially <br />or advers~ly affect other proposed developments, or materially disturb <br /> <br />the economic feasibility of the entire basin development. At the request <br /> <br />of the States of Colorado and New l,lexico, the Bureau of Reclamation <br /> <br />commenced investigation of the La rlata Project many years ago. At least <br /> <br />t,,,o reports have bcen issued by th<3 Bureau. The Colorado land O1^mers <br /> <br />have organized a district under the Colorado Conservancy District Act. <br /> <br />The La Plata water users have expended considerable money and put forth <br /> <br />every effort to obtain a project only to be faced with years of delay <br /> <br />and disappointment. Fair treatment of the La Plata farmers requires <br /> <br />the inclusion of the La Plata Project for initial authorization as a <br /> <br />participating project under the Colorado River Storage Project plan. <br /> <br />Attention is directed to the fact that the Paonia Project, which <br /> <br />"0 ,." <br /> <br />is included in the list of participating projects recommended for initial <br /> <br />authorization, has twice been authorized by Congress. The increase in <br /> <br />construction costs, the addition of certain acreage, and the relocation <br /> <br />of the proposed storage reservoir have resulted in substantially increasing <br /> <br />the project cost. This necessitates either reauthorization or amended <br /> <br />authorization. The report on the revised project plan has been pending <br /> <br />before the Bureau of the Budget 'fOr some time. A bill has been introduced <br />