My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04026
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:20 PM
Creation date
10/12/2006 12:05:24 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.400.10
Description
Colorado River Basin Salinity Control - Federal Agencies - BLM - Report to Congress
Basin
Colorado Mainstem
Water Division
5
Date
7/1/1987
Author
BLM
Title
Salinity Control on BLM -Administered Public Lands in the Colorado River Basin - A Report to Congress - July 1987
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />w <br />w <br />(0.' <br />.j; <br /> <br />Bureau of Land Management Activity Plans <br />Project Objectives* Status Type of <br />I Reduce salt yields by 50% completed structural <br />Elephant Skin Wash 3,000 tons. Reduce IC <br />Verification Project sediment yields by <br />Uncompahgre, CO 100,000 tons. Provide <br /> flood control. Increase <br /> wildlife habitat <br />2 Reduce salt loads by Plan approved vegetative, <br />Spring Creek Basin! 8,500 tons. Reduce lOC structural, <br />Disappointment Valley sediment loads by 20V point source <br />San Juan, CO 280,000 tons. Increase <br /> vegetation production. <br /> Provide seasonal water <br /> for wildlife, wild <br /> horses, livestock. In- <br /> crease wildlife habitat <br />3 Reduce salt yields by 50% completed vegetative, <br />Lower Wolf Creek 3,000 tons. Reduce 5C structural <br />White River, CO sediment yields by 20V <br /> 100,000 tons. Increase <br /> vegetation cover. <br />4 Reduce salt yields by 33% completed structural <br />Milk and Alkali Creeks 500 tons. Reduce sedi- 3C <br />Glenwood Springs, CO mentyields by 51,000 <br /> tons. Create 1.8 acres <br /> of riparian habitat <br />5 Reduce salt yields by Plan approved structural <br />Poison Creek 120 tons. Reduce sedi- 2C <br />Glenwood Springs, CO ment yields by 27,000 <br /> tons. Stabilize 1,300 <br /> feet of stream. Create <br /> 4.6 acres of riparian <br /> habitat. Create 1.9 , <br /> orr<>. nf wetlonrl.. <br />6 Reduce salt yields by 10% completed structural, <br />Grand Valle~ 5,000 tons annually. 4C vegetative <br />Grand JunCl1on, CO Reduce sediment yields 20V <br /> by 250,000 tons annual- <br /> ly. Increase vegetation <br /> cover by 20%. <br />7 Reduce salt yields by Plan approved structural, <br />Round Valley 350 tons. Reduce sed i- 5C vegetative <br />Kanab, UT ment yields by 113,000 20V <br /> tons. Increase vegeta- <br /> tion cover. <br /> <br />.. <br /> <br />*Salt and sediment reductions are estimates based upon projecllife unless specified otherwise. <br />C Years to complete. <br />V Years to verify objectives. <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.