Laserfiche WebLink
<br /> a <::> <br />Table 17. Travel time and data collection costs for Colorado Phase II Instream Flow Study ~) <br /> versus stream width. CJ <br /> ~,' <br /> ~"" <br /> X-Sec- en <br /> Stream Travel X-Sec- tions Total X-Sec- <br /> wid th (man- tions (man- hours Total tions <br /> Stream name (ft) hours) (number) hours) expended cost (cost) <br />Cache 1a Poudre River, 40.0 29.0 8 20.0 49.0 $285 $36 <br />Little South Fork <br />Carnero Creek, South Fork 9.3 41.0 32 36.0 77 .0 447 14 <br />Cucharas River 16.1 25.5 21 21.0 46.5 270 13 <br />Cunningham Creek 13.8 17.0 21 30.0 47.0 273 13 <br />East River 90.0 14.0 8 27.5 41.5 241 30 <br />Fryingpan River I & II 72.7 35.0 21 79.0 114.0 662 32 w <br />Fryingpan River, No. Fork 23.6 34.0 18 33.5 67.5 392 22 w <br />Fryingpan River, So. Fork 27.2 34.0 14 21.0 55.0 320 23 <br />Gunnison River, Lake Fork 47.6 23.5 18 33.0 56.5 328 18 <br />Huerfano River 13.8 45.0 24 29.5 74.5 433 18 <br />Rio Grande River, So. Fork 54.5 34.0 18 24.5 58.5 340 19 <br />Sangre de Cristo Creek 8.2 19.0 24 18.0 37.0 215 9 <br />St. Louis Creek 17.6 34.0 21 28.0 62.0 360 17 <br />South Platte River I & II 93.5 22.0 7 29.0 51.0 296 42 <br />Williams Fork River I & II 62.4 40.0 27 52.5 92.5 537 20 <br />a hourly wage of $s.81/man-hour. <br />Assumes an average <br />