Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />DOu267 <br /> <br />CHAPTER <br /> <br />LITILE SNAKE RIVER DEPLETION STUDY <br />TABLE OF CONTENTS <br />(continued) <br /> <br />3.0 PROJECf CONFIGURATIONS FOR WIRSOS MODELING <br /> <br />3.1 Introduction. . . , <br /> <br />3.2 Project Characteristics <br /> <br />3,2.1 Pot Hook Project <br />3.2.2 Powder Wash Project. <br />3.2.3 P&M Coal Mining Company Project <br /> <br />3.3 Modeling Scenarios . <br /> <br />3.3.1 <br />3.3.2 <br />3.3.3 <br />3.3.4 <br />3.3.5 <br /> <br />REFERENCES. <br /> <br />APPENDIX <br /> <br />Scenario No. 1 <br />Scenario No.2 <br />Scenario No. 3 <br />Scenario No.4 <br />Scenario No.5 <br /> <br />LIST OF APPENDICES <br /> <br />A Subject Water Rights Decrees and Applications <br /> <br />B Tabulation of Water Rights Used in the Sandstone Depletion Study <br /> <br />II <br /> <br />PAGE <br /> <br />21 <br /> <br />21 <br /> <br />21 <br /> <br />21 <br />26 <br />30 <br /> <br />33 <br /> <br />33 <br />34 <br />34 <br />35 <br />35 <br /> <br />36 <br />