My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03984
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP03984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:06 PM
Creation date
10/12/2006 12:03:56 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8142.400
Description
Trinidad Project - Reports
State
CO
Basin
Arkansas
Water Division
2
Date
4/1/1964
Author
Unknown
Title
Synopsis of Irrigation Report - Trinidad Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />O~1880 <br /> <br />to the project account. During the summer any portion of the first <br />300 c.f.s. flowing into the reservoir not needed to meet concurrent <br />irrigation demands will be credited to the project account and flows <br />above this amount credited to the Model account. When either account <br />is f'ull reDlllining storeable flows accrue to the unfilled account. <br />When :project water is available during the irrigation season all crop <br />requirements will be met. This means that river flows will be shared <br />equally by the Model and all other ditches and that remaining require- <br />ments will be met by reservoir releases; releases to the Model coming <br />from the Model account and releases to other areas from the project <br />account. However, when the Model account has beeIl depleted down to 1.200 <br />acre-feet, the Model area fIJEJ;;f draw OIl the project account reserving the <br />1,200 acre-feet for its exclusive use when the rest of the project area <br />has returned to irrigation under the :priorities of the :project ditches. <br /> <br />The criteria provide that the conservancy district board determine <br />the irrigation requirements from time to time during the irrigation <br />season as conditions vary. They provide that each ditch system be <br />responsible for the distribution of its allocated water to the water <br />users. <br /> <br />Water stored in the permanent fishery pool is to be furnished by <br />the state of Colorado. <br /> <br />The follOWing table gives the water supply requirement for each ditch <br />and that afforded by the :project under these criteria: <br /> <br />River Diversions--1000 ac.ft. <br /> <br />Ditch System <br /> <br />Optimum Requirement <br /> <br />Available with Project <br /> <br />Bace. Joint <br />Ch.l,lili <br />Sout,b Side <br />El Moro <br />Jobn's Flood <br />MoJ.d <br />Hoehne <br />Burr.G & Duncan <br />LeH('J.ling & McCormick <br />Salas <br /> <br />7.55 <br />0035 <br />19.79 <br />0.~7 <br />6.45 <br />19.15 <br />4.72 <br />1.01 <br />1.20 <br />0.52 <br /> <br />6.33 <br />0.,35 <br />15.08 <br />0.l~3 <br />6.00 <br />14.91 <br />4.33 <br />l.00 <br />1,20 <br />0.52 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.