Laserfiche WebLink
<br />'. <br /> <br />0:1878 <br /> <br />it could have been used much more efficiently if applied at the time it <br />was needed. Details are shown in the following table: <br /> <br />Project diversion requirement <br />Project d1versions: <br />To meet crop requirements <br />Winter diversions <br />In excess of crop requirements (in Irrigation Season) <br />Total <br />Apparent shortage (61,200 - 37,300) <br /> <br />61,200 <br /> <br />37,300 <br />9,300 <br />6.600 <br />53,200 <br />23,900 <br /> <br />Since there are no substantial new water supplies available, improve- <br />ment in the supply for the Trinidad area must be accomplished by increas- <br />ing the efficiency of the existing supplies. The dominant factor of the <br />project o]1eration is, therefore, 1mprOlling the _tel' use efficiency. <br /> <br />The water use efficiency is improved by: <br /> <br />1. Lim1ting irrigation to 19,717 acres. <br />2. Limiting Diversions and Reservoir releases to the <br />crop requirements. <br />3. When water is available in the reservoir all water <br />rights would be exercised for the benefit of all <br />irrigated lands. <br />4. Priority of use as between water rights would be <br />exercised only when the project water supply is <br />exhausted. <br /> <br />In this manner, flows historically diverted in excess of crop requirements <br />and most winter flows may be stored in Trinidad Reservoir under the trans- <br />ferred Model storage right. <br /> <br />An inventory of the water supplies wi tb and without the project is <br />given in the following summary: <br /> <br />Summary of Project Operation Studies <br /> <br />Water supply available above project <br />Project return flows <br />Total <br />Irrigation <br />Irrigation & Stock water <br />Stock water with project <br />Evaporation Trinidad Reservoir <br />Total diversions <br />In River below Project <br /> <br />Historic <br />63,600 <br />18,800 <br />82,400 <br /> <br />53,200 <br /> <br />53,200 53,200 <br />29,200 <br /> <br />Water supply above project <br />Water in River below project <br />Project depletion (Including evaporation) <br /> <br />63,600 <br />2,,200 <br />3 ,400 <br /> <br />5 <br /> <br />Future <br />With Project <br />63,600 <br />19,400 <br />83,000 <br /> <br />51,100 <br /> <br />1,500 <br />1,100 <br />53,700 <br /> <br />53,700 <br />29,300 <br /> <br />63,600 <br />2~.300 <br />3 ,300 <br />