My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03951
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03951
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:35:32 PM
Creation date
10/12/2006 12:03:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
River Basin General Publications - Missouri River General Publications
Date
6/1/1973
Title
Information Report on Proposed Power Rate Adjustment Eastern and Western Divisions
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1135 <br /> <br />EXHIBIT C <br /> <br />IRRIGATION DEVELOPMENT <br /> <br />SCHEDULE OF DEVELOPMENT FOR SELECTED UNITS REQUIRING ASSISTANCE <br />Exhibit C-l indicates the irrigation development schedule possible <br />prior to the year 2005 under the established repayment criteria. The <br />vertical line on the left of each irrigation block or unit indicates <br /> <br />the estimated year water service will be initiated. Total irrigation <br /> <br />acreage developed to be in each State within the P-S MBP is also shown. <br /> <br />The optimum rate or scale of irrigation development is limited by the <br /> <br />repayment criteria, and the available surplus power revenues determined <br /> <br />in the repayment study and by the estimated municipal and industrial <br />water revenue available to aid in meeting repayment criteria. <br /> <br />Repayment criteria for irrigation units are the same as were sanctioned <br /> <br />in the Department's "Report on Financial Position, Missouri River Basin <br /> <br />Project," December 1963. The repayment of commercial power investments <br /> <br />with applicable interest within the prescribed 50-year limit is the <br />first in order of repayment requirements. Secondly, repayment of irri- <br /> <br />gation investments in existing units must be completed and repayment of <br /> <br />units under construction must be scheduled to meet the prescribed <br /> <br />50-year repayment period following development period before available <br /> <br />power and industrial water revenues may be used to repay irrigation <br /> <br />43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.