Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1121 <br /> <br />F. Amount and TiminR of Rate Ad;ustments Proposed (Western Division) <br /> <br />The Western Division, P-S MBP, rate schedule will be increased <br /> <br /> <br />to yield an average of 0.25 mill/kwh above the 6.l5 mills/kwh <br /> <br /> <br />currently received for firm energy marketed under the MRB-F3 <br /> <br /> <br />rate schedule. <br /> <br />The new rate schedule will become effective on January l, 1974, <br /> <br />billing period. <br /> <br />Structural changes in the rate schedule include: <br /> <br />l. <br /> <br />Increase the capacity charge from $l.OO/kw per month <br /> <br />to $l.27/kw per month. <br /> <br />2. Adopt a single energy charge of 4.00 mills/kwh in lieu <br /> <br />of the two-step energy charges of 4.5 and 4.0 mills/kwh in <br />schedule MRB-F3. <br /> <br />3. Eliminate the minimum annual capacity charge as used <br /> <br />in schedule MRB-F3, and establish a minimum monthly bill <br /> <br />of $l.27/kw of the effective contract rate of delivery. <br /> <br />No change in existing rate schedules for certain special purposes, <br /> <br />accounting for approximately l.5 percent of total sales, is proposed. <br /> <br />In addition to the above adjustments to existing rates, a new rate <br /> <br />is proposed for sales of peaking power at $l5.50 per KW year with <br /> <br />no energy (all energy returned off-peak). <br /> <br />36 <br />