My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03951
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03951
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:35:32 PM
Creation date
10/12/2006 12:03:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
River Basin General Publications - Missouri River General Publications
Date
6/1/1973
Title
Information Report on Proposed Power Rate Adjustment Eastern and Western Divisions
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I 11.12 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />with existing repayment criteria. To reduce the existing <br /> <br />disparity of about l.77 mills per kilowatt-hour between <br />Federal firm power yields within the P-S MBP, the required <br />firm power rate increase was apportioned about 60 percent <br /> <br />Eastern Division and 40 percent Western Division. As pre- <br /> <br />viously discussed, basic legislative authority for Eastern <br /> <br />and Western Division development is consistent with the <br /> <br />Flood Control Act passed by Congress in 1944. <br /> <br />We now have a major opportunity to maintain the financial <br /> <br />integrity of the entire Pick-Sloan Missouri Basin Program. <br /> <br />This action is most desirable in providing a continued supply <br /> <br />of low-cost electric power to all our P-S MBP preference <br /> <br />customers. <br /> <br />Federal multiple-purpose water resource developments have <br /> <br />produced a substantial block of low-cost electrical energy <br /> <br />that under Federal law has been made available to agricultural, <br /> <br />residential, and small commercial consumers. We believe <br /> <br />everyone who has benefited can take satisfaction from these <br /> <br />accomplishments and the program of keeping the P-S MBP on a <br /> <br />sound financial basis. <br /> <br />C.. Amount and Timing of Rate Adjustments Proposed (Eastern Division) <br /> <br /> <br />New Eastern Division rate schedules would be put into effect as <br /> <br /> <br />of January l, 1974. <br /> <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.