Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1092- <br /> <br />F. Y. - 1972 ARRS <br />EASTERN DIVISION <br /> <br />SOURCE OF REVENUE <br /> <br />STU DY I N PUT <br /> <br />PEAKIN G pow E R <br />PEAKING ENERGY <br />DUMP ENERGY <br />IRRIGATION ENERGY <br /> <br />OT HER REV E N U E S <br />REPLACEMENT <br />MAINTENANCE <br />SHORT-TERM FI R M <br />SUMMER FIRM <br />OTHE R .1J <br /> <br />$6.60/KW/S EASON <br />3.0 MI LLS I KWH <br />3.0 MILLSI KWH <br />2.5 M I LLSI KWH <br /> <br />5.0 MILLS/ KWH <br />4.3 MILLS/ KWH <br />5.2 MILLS/ KWH <br />4.6 MILLS/ KWH <br /> <br />.!.l INCLUDES SYSTEM FACILITY CHARGES, CANYON <br />FERRY HEADWATER BENEFITS, SPA INTERTIE,WHEELlNG <br />REVENUES(INCLUDING BASIN 1st AND 2nd UNITS) AN D <br />MINIMUM REVENUE FROM ABOVE-ADVERSE WATER <br />PEAKING. <br />