My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03947
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03947
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:52:57 PM
Creation date
10/12/2006 12:03:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.09
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
2/25/1999
Author
USDOI-BOR
Title
Implementation of Glen Canyon Dam Operations Biological Opinion-1998 Progress Review
Water Supply Pro - Doc Type
Biological Opinion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />;" <br /> <br />.. <br /> <br />.~. -., <br /> <br />PROGRESS ELEMENT 4 <br />Some evaluation of the tributaries to determine suitability have been undertaken by the Service, <br />funded by Reclamation. Havasu Creek was identified as the location with the greatest likelihood <br />of success. The Supai tribe has indicated they are not amenable to having endangered fish in <br />this area. Considering the preferred location of a second spawning population of humpback chub <br />is in the mainstream Colorado River, and that establishment is largely dependent upon warmer <br />water temperatures, success is likely dependant on the temperature control device currently <br />under consideration, and/or implementation of low steady summer flows. Therefore, the <br />available staff and funding resources have been applied to those other items, which are expected <br />to produce tangible benefits for endangered species much more quickly. <br /> <br />" <br /> <br />STATUS OF ELEMENT 4 <br />ONGOING. Efforts related to establishment of a second spawning aggregation of humpback <br />chub are being focused primarily on the assessing the feasibility of a temperature control device <br />and testing of low steady flows, however, funding has also been made available through the <br />adaptive management program to develop a report and schedule describing the steps required to <br />accomplish establishment of a second population of humpback chub in the Colorado River <br />ecosystem. The GCMRC is expected to award the contract sometime in March 1999. <br /> <br />'..' <br /> <br />~) <br /> <br />:~. <br /> <br />;'. <br /> <br />: ~ <br /> <br />';:' <br /> <br />" <br />~; <br /> <br />.c <br />r-; <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.