My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03925
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03925
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:52:50 PM
Creation date
10/12/2006 12:02:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
3/1/1962
Author
USDOI
Title
Fifth Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER STORAGE PROJEOT <br /> <br />19 <br /> <br /> <br />service buildings at Fontenelle community, Negotiations were started <br />in June for relocation of U,S. Highway 189. <br />A compatible solution was reached in the problem of trona deposits <br />within the irrigable area of the project by the adoption of a plan for <br />stage development of the Seedskadee project which will allow the devel- <br />opment of both the trona and irrigation resources of the project. <br /> <br />SMITH FORK 'PARTICIPATING PROJECT, COLORADO <br /> <br />At June 30, 1961, work on the prime contract for construction of <br />the earthfill Crawford Dam was slightly ahead of schedule with phys- <br />ical completion estimated at 36 percent in 34 percent of the overall <br />time allowed by the cop.tract, Concrete placements were completed, <br />in the outlet works, intake structure, and outlet tunnel lining. <br />Contract for relocation of Black Canyon Road was completed <br />during the year. Contracts were awarded and work started on the <br />relocation of Colorado State Highway 92, and on earthwork and <br />structures for the Aspen Canal. <br /> <br />FLORIDA PARTICIPATING PROJECT) COLORADO <br /> <br />Funds were appropriated for initiating construction of the Florida <br />participating project during fiscal year 1961. Activity during the <br />$5cal year was directed mainly to the preparation of design data for <br />fisojeet features. A contract for construction of the Lemon Dam and <br />prunty road relocation was awarded June 30, 1961, in the amount of <br />cO,820,807, <br /> <br />ADVANCE PLANNING ACTIVITIES <br /> <br />The definite plan report on the Emery County project in Utah was <br />completed in October 1961, and funds were appropriated for initiating <br />constrllction in fiscal Y'lar 1962, <br />Investigations,and studies on the potential Crystal Dam and power- <br />plant of the'Curecanti storage unit were continued during the year. <br />Advance planning studies for definite plan. reports were continued <br />during the fiscal year on other authorized participating projects, <br /> <br />3. ALLocATION OF FEDERAL INVESTMENT <br /> <br />Section 6 of the authorizing act states that upon completion of each <br />unitj participating project, or separable feature thereof, the Secretary <br />shal allocate the total costs of constructing said unit, project, or <br />feature to the various purposes authorized in the act or authorized <br />under reclamation law.. No projects or units have been completed; <br />therefore, no formal allocations to the several purposes to be served <br />by the project have been made of the cost to June 30,1961. However, <br />tentative allocations have been made of the total estimated cost to <br />
The URL can be used to link to this page
Your browser does not support the video tag.