Laserfiche WebLink
<br /> <br />. <br /> <br />W. G. Wilkinson, Water Commissioner for District No.3, has So, ?i,fI. <br />determined the surplus flow from 1947 to 1960 from the daily ,9P.er-~ J+~7;"hl ) <br />ations on the river and consideration of downstream riabts. ~ese r J, <br />flows, averaging 24,500 acre-feet per year are presented in Table 2 <br />and represent flows storable under a new storage right. <br /> <br />19 <br /> <br /> <br />Historic vs Future Conditions <br /> <br />A base condition for measuring the effects of the Cache la <br />Poudre Unit was developed by considering significant changes in the <br />historic water supply and use that may be expected to occur in the <br />future without construction of the unit. <br /> <br />. <br /> <br />The "future without" situation for the Poudre Basin was assumed <br />to comprise the presently irrigated lands and presently developed <br />irrigation facilities with the effects of a considerably expanded <br />municipal and industrial use of' present water supplies (discussed <br />elsewhere in this report). No developments are foreseen which wouJ.d <br />alter the Mountain Supply from historic conditions. Historic <br />trans!llountain imports were assumed indicative of future conditions. <br />I'resent ground water development and use were considered representa- <br />tive of the future conditions. Since CBT deliveries to the Poudre <br />Basin began in 1953, an average of 105,500 acre-feet per year has <br />been d.elivered for use in the 'basin, with a maximum of 155,700 acre- <br />feet in 1954. Based on studies prepared by the Region 7 Hydrology <br />Branch, "Colorado-Big Thompson Project unused carriage capacity," <br />May 1961, it was estimated that CBT deliveries to the poudre wouJ.d <br />have averaged 117,500 acre-feet per year during the 1947-1960 period, <br />had that project been in full operation throughout the study period <br />(See notation on Table 4). The estimated future CBT deJ.iveries were <br />considered in developing the base condition. <br /> <br />Basin outflow will also be influenced to a degree by the CBT <br />Project. It has been estimated that 10.3 percent of the CBT deliveries <br />to the Poudre wouJ.d escape the Poudre basin as return flow. y <br /> <br />Basin Depletion Studr <br /> <br />An analysis of historic water supply and depletions of thie <br />supply within the Poudre Basin is presented in Table 3. The first <br />step in the a.ne.1ysis was estimating a net annual water supply, column <br />(6), which included the mountain supply, precipitation over the <br />irrigated area and CBT deliveries, less the annual change in content <br />of the plains reservoirs. Basin outflow, column (9), was determined <br /> <br />. <br /> <br />Y CBT Definite Plan Report, Appendix I, Chapter 2, Page 298. <br />