My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03879
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03879
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:52:36 PM
Creation date
10/12/2006 12:01:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.300.40.A
Description
Colorado River Compact
Basin
Colorado Mainstem
Date
3/15/1922
Author
Colorado River Com.
Title
Proceedings of the Hearings on the Colorado River Development before the Colorado River Commission March 15, 16, 17, 1922 Phoenix
Water Supply Pro - Doc Type
Publication
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />Ie <br /> <br />. <br /> <br />"durthermore, B private corporetion would necessarily con- <br /> <br />tinue to charge a high rate on its invested capital as long as it <br /> <br />Controlled th~ project, whereEs the Stlites of Arizona and Californi: <br /> <br />might decide tc liquidate the bonded indebtedness by easy stages, <br /> <br />aoU. undou bteclly would a ventually. \,hen this time come s, they <br /> <br /> <br />would be in a position to saIl power at cost for a do3Jlar or two <br /> <br /> <br />per h.u. year at the switchbsard, but probably they would sell it <br /> <br />at 2 profit, returning millions to their respective State Treas- <br /> <br />uries each year. <br /> <br />"Director ;)a vis estimates the firl'l't project to cost as follows~ <br /> <br />D2m <br />Power Plant <br />Tr2nsmission Lines <br /> <br />$50,000,000 <br />22,000,000 <br />18,000,000 <br />$90,000,000 <br /> <br />TOtE_1 <br /> <br />"For the cooperative plan the annual intecest charges would. <br />be, S-'3.Y seven :~r oent, or $6,300,000. He estimates such a pro- <br /> <br />ject with a dam 500 feet high and with the variable head obtain- <br /> <br />1ng, would develop more than GOO,OOO H.P. which, with the great- <br /> <br /> <br />storage back of it and wi th !i pOl'ler plant s OIJJewhat larger in cap- <br /> <br /> <br />acity than requirod for the average power, the project could be <br /> <br /> <br />malle to yiel d & i'eturn on th is amount of power annually. <br /> <br />"On this basiS, when the mar]~et is established for this amount <br /> <br />of power, it would o)~)ear that power could be readily sold at the <br /> <br />switchboar'i for under~17 lJer horsepovier year, a rema:rkabl, low <br /> <br />fi!!1Jre. hith su-osequent de"elo~ments, power could be sold for less, <br /> <br />for reasons ex?lained before. <br /> <br />P. <br />
The URL can be used to link to this page
Your browser does not support the video tag.