Laserfiche WebLink
<br />. <br /> <br />0027B <br /> <br />. <br /> <br /> <br />MISSOURI BASIN mrER-AGENCY COMMITl'EE <br />SUBCOMMITTEE ON COMPREHENSIVE BASIN PLANNING <br /> <br />Chapter II <br /> <br />OUtline for Study <br />of <br />Translation of Projections Into Demands <br />for (1) <br />Land aiid"Water <br /> <br />Municipalities and Industries Water Requirements <br /> <br />1. Land <br /> <br />It is assumed that the Work Group on Land Resources Availability <br />will provide for establishing the requirements for land. <br /> <br />II. Water <br /> <br />A. Municipal Water Supply (Population projections for 1980 and <br />2020 will be needed or/and provided by the Economics Work <br />Group) <br /> <br />1. Estimation of per capita consumption <br /> <br />a. Current (1965) and past trends - specific locality <br />(IdentifY localities and updating of 1960 population <br />data will be needed or/and provided by the Economics <br />Work Group.) <br /> <br />b. Short term (1980) - specific locality (IdentifY <br />localities and projected 1980 population will be <br />needed or/and provided by the Economics Work Group.) <br /> <br />c. Long term (2020) - by subbasin (Identify subbasins and <br />projected 2020 population wilJ. be needed or/and pro- <br />vided by the Economics Work Group.) <br /> <br />2. Determination of adequacy of current supply (quality and <br />quanti ty ) <br /> <br />3 . Addi tional needs <br />a. Current (1965) - by specific locality and subbasins <br /> <br />(1) Prepared by the Work Group on Water and Related Land Resource Needs <br /> <br />9 <br />