Laserfiche WebLink
<br />052-41-9l623-lffi - (2) <br /> <br />Sheet 2 of 5 <br /> <br />001055 <br /> <br />10. <br /> <br />, <br />~ <br />I) <br />. <br /> <br />I' <br /> <br />11. <br /> <br />I . 12. <br /> . <br /> 13. <br /> <br />I1AJOR RSSERVOIR PROJECTS IN AREA COVERED BY PROPOSED <br />"ARKANSAS RIVER VALLEY .I.UTHORITY !.CT OF 1941" <br /> <br />Name ' <br /> <br />Estimated Cost <br /> <br />Status <br /> <br />StreBIll <br />Location <br />Purpose <br /> <br />Capacity <br /> <br />9. DENISON (e) Under Construction-F.C.Aot 1938 $35.000.000 <br />Red River 9.200.000 A.F.Total <br />Near Denison. Grayson Co.. Texas <br />Flood Control, possibly power <br /> <br />DRURY (b) Indeterminatei:; 2,660,000 <br />Chikaskia River, Trib. Salt 170.000 A.F.Total <br />Fork of Arkansas River <br />Sumner Co.. Kansas <br />Flood Control <br /> <br />ELK <br /> <br />(b) Indeterminate <br />River, Trib. Verdigris R. 535.000 A.F.Total <br />l'Iontgomary Co.. near Independenoe. !Cans. <br />Flood Control in Verdigris River Basin <br /> <br />o 5.864.000 <br />(b) <br /> <br />Elk <br /> <br />EUFAULA (b) Indeterminate ~ 5,870.000 <br />Canadie.n River.. near mouth 800,000 A.F.Tote.l <br />McIntosh Co., Oklahoma <br />Flood Control in lower Arkansas River Basin <br /> <br />FALL RIVER (c) Indeterminate <br />Fall River. tribe Verdigris River <br />Greenwood Co.. near Wiohita. Kansas <br />Flood Control in Verdi gri s River <br /> <br />107.000 A.F.Total $ 1,216,000 <br />01.27 <br /> <br />Basin <br /> <br />14. FORT GIBSON . (g) Survey Completed (Pub.738)74th Congress <br />On Grand (Neosho Hiver) nee.r mouth <br />\lagoner Co. near Muskogee. Oklahoma 851,000 A.F.Total !;;13,700.000 <br />Flood Control in Arkansas and <br />Mississippi River Basins and Power <br /> <br />15. FORT SUPPLY (f) (c) Under Construotion-F.C.Aot 1936 $ 8.800.000 <br />Wolf Creek, tribe North Canadian River 118.000 A.F.Total <br />Woodward Co.. Oklahoma <br />Flood Control on North Canadian River <br /> <br />160 <br /> <br />. <br /> <br />17. <br /> <br />GALENA (d) Indeterminate <br />James River. tribe Hhi te River <br />Stone Co. near Galena, Mo. <br />Flood Control and Power <br /> <br />$ 9,660,000 <br /> <br />GREAT SALT PLAINS (a) Under Construction-F.C.Act 1936 <br />Salt Fork of Arkansas River <br />Alfalfa Co., E. of Cherokee. Okla. 317,000 A.F.Total <br />Flood Control and Wild Life <br /> <br />$ 3.733.000 <br />(d) <br />