Laserfiche WebLink
<br /> <br />Inta~e towers for me Foothills tunnel and treat/1'lf:'nt plant and me Aurora <br />r:1rvefSJOn are under COnSlrl.JCtlOn on me no!lt abutment appr()}rJmiJleI~ <br />ISO;r uostrwm a/the dam The FooltlJI/s-jntai<.e IS the larger of the rwo <br /> <br />Low-lev€! v.-ew trom upstream shOws the double-curvature shape 0/ <br />the dam Formwori-: near the lOp is for the ~ and oven'lOw sectIOns <br />ai/he servICe s{)Illwal The doggmg OIarform and gale {JIers lor the outlet <br />workS are DekJ... <br /> <br /> <br />6 <br /> <br />An aSSOCiation 01 tnree engineering tlrms ...as retained to, <br />...-or,,- on tne Foolhllls ProteCt In general each 01 tne ltrms has <br />lal<..en resPOns:blllty tor one malar SlruCfural element They <br />Include <br /> <br />$tronlia Sormgs DiverSion Dam- Harza Engmeenng <br />Comoany <br /> <br />2 FootMs Tunnel ana access roads-DMJM-PMIDS Reisler <br />Inc <br /> <br />3 Foothills Treatment Ptanl-CH2M-HII <br /> <br />Englneenng seNlCeS halie fflcluded prede5lgr'1 stud'es_ environ- <br />mental assessments final de5lQn, servtCes during conslrucllon, <br />and on-$jte Inspecllon <br />The Predesign RePJn, In '....hlCh a~ernalilie structural arrange- <br />menls were compared and deSign Cnlerla established was <br />compleled In 1973 and hnal deSlQn began soon ailer An enVl. <br />ronmental assessment ,'o'as submlned to the resPJnSlble gov- <br />ernment agenCies In 1974 and the final Environmental Impact <br />Stalement.....aslssued In February 1978 Additional studIeS and <br />review were reqUired pnor TO iSSUanCe ot the Federal Dredge <br />and Fill (404) Permit al ,.,-hlCh lime the way was finally cleared <br />for preparatlOn a! bid documents and the award of contracts <br />The prinCipal construCliOn contracts were awarded In 197910 <br /> <br />MOrrison-Knudsen Co lnc - SrronTla SPrings Dam <br /> <br />2 Shank-AnukovlCh/JV -Connecting tunnels <br /> <br />3 Manln K Eby Construction Company Inc - TreaTment <br />planl and hrst section 01 lhe cleaN/ater condUit <br /> <br />4 C R Fedrick/Kassler Corp -Balance of lhe clearwater <br />COndUit <br /> <br />Slronlia SPrings Dam <br /> <br />Strontl3 SPflngS Wlit be a 300-tHHgh multl-curvature arCh dam <br />30 Il thICk allhe base and laperlng to 10 il thick at the crest The <br />slte IS located 6 5 miles up WaTer10n Canyon al a place where <br />hard strong igneous and metamorphIC rocks form a local con- <br />stnCllOn The canyon walls are sleep (about one hOrizonTal to <br />one vertical) and form a nearly symmetncal V shape whICh IS <br />deal tor an arch dam <br />Operarlonal tealures at the dam Include eight low-level outfets <br />tw'o SPillways, and two Inlake towers The purp:)se of the OuTlets <br />IS 10 maintain downstream fiver flows when the reservOlr IS below <br />lhe Spillway cresllevel The 4_ooo--cls ClP3CITy at the outlels WIIi <br />be dlvded bel'....een four 72-mch conduI1S conlrolled by 48-Inch <br />nng,el vaWes (whICh Will be used lor larger !kJws) and four smaller <br />condUits controlled by tw'o 18-mch and two 8-lnch flng Jet vawes <br />tor smaller releases The tree discharge valves Will be protected <br />by conteal plug valves and trash racks A ninth COndUlI at about <br />normal river level Will be aval!able to completely drain the reser. <br />vOir 11 necessary <br />The 1'....0 Spillways Wilt have a lotal discharge CloaCITy of ap- <br />proXimately 90,000 cts A servICe Spillway located allhe center <br />01 the crest 01 the dam wlll discharge through three ungated <br />openings IntO a plunge pool excavated In the eXisting fiver chan. <br />nel The crest ot the servICe spillway Will be al elevatIOn 6002, <br />normal reservOIr level The Shape ot the Spillway ogee whlCh wlil <br />contine discharges to the plunge pool area IS SImilar to that 01 <br />the Harza-deslQned Mossyrock arCh dam In WaShingTon whlCh <br />has been operallng successfully for some 12 ,,,ears <br />The auxlll3ry sOfllway IS k:lcated In lhe lell abuTmenl and con. <br />Slsls at <I short concrete chute whICh Will, If It IS ever Cllled upon <br />to operate, diSCharge well downstream of the dam Fk:)w through <br />the auxihary Spillway Will be controlled by a 17 5-ft -hlQh earThllli <br />fuse plug conslructed across the chure The Spillways are de- <br />S1Qned so that Nows up 10 12,000 cIs (well above lhe flooc:l-ol. <br />record} Will be handled by the servJCe SPillway ak:)ne At that <br />