My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03805
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03805
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:52:14 PM
Creation date
10/11/2006 11:59:11 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.J
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
1/1/1949
Author
USDOI/BOR
Title
Boulder Canyon Project Final Reports: Part VII/ Bulletin 3 - Cooling of Concrete Dams
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />c <br />'-=' <br />C'J <br /> <br />c <br /> <br />XIV <br /> <br />CONTENTS <br /> <br />CHAPTER X-cOMMENTS ON THE DESIGN AND OPERATION <br />OF A COOLING SYS1EM-Gontinued <br /> <br />MODIFICATIONS OF HOOVER DAM PROCEDURE USED IN <br />LATER DAMS <br />Section Pa(J~ <br />119. Hoover Dam procedurenn___hu__________________nn_______ 195 <br />120. Modifications in contraction joints____nnnnnnn____________ 196 <br />121. Modifications in cooling pipe iDstallations___________,_______~_____ 196 <br />122. Modifica.tions in first-sta.ge cooling_ u __ _ n_ _____ _ __ __ _ _ __ __ __ _ __ 197 <br />123. Modifications in second~sta.ge cooling:: ___ ___ _ __ ___ _ ___ _ _. __ ~ _ _ __ _ 197 <br /> <br />COOUNG OF CERTAIN CONCRETE DAMS BY ARTIFICIAL MEANS <br /> <br />124. List of references__~_______________________________'____________ 197 <br /> <br />CHAPTER XI-cOOLING EXPERiENCES AT HOOVER <br />DAM THROUGH 1947 <br /> <br />125. Use of research measurements_ _ ____ _ _u ___ ____ ____~_ __ _ ___ _ __ __ 201 <br />126. Resista.nce thermometers~___ ___ ___ _ ____ _ __ __ _ _ ____ _ _ __ _ _ __ ___ _ _ 201 <br />127. Average tempera.ture rise in the dam____________________________ 203 <br />128. Cooling status as of December 1,1933______________.:.____________ 206 <br />129. Cooling status as of December 1, 1934___________________________ 211 <br />130, Plugged cooling coils__________________________________________ 211 <br />131. Exposure temperatures_ _ _ __ __ _ __ ___ ___ ___ __ _ ___ __ _ _ ___ _ __ __ _ __ 224 <br />132. Founda.tion temperatures_ _ _ ___ ____ _ ___ _ __ _ __ ___ ___ _ __ ____ ___ __ 230 <br />133. Temperature distribution in 1946_______________________________ 232 <br />134. Surnrnary____________________________________________________ 232 <br />
The URL can be used to link to this page
Your browser does not support the video tag.