My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03805
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03805
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:52:14 PM
Creation date
10/11/2006 11:59:11 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.J
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
1/1/1949
Author
USDOI/BOR
Title
Boulder Canyon Project Final Reports: Part VII/ Bulletin 3 - Cooling of Concrete Dams
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00 <br />O? <br />In <br />N <br /> <br />c <br /> <br />xu <br /> <br />CONTENTS <br /> <br />CHAPTER VI-ARTIFICIAL COOLING BY WATER <br />FLOWING IN EMBEDDED PIPES-Continued <br /> <br />COOLING BY LONG EMBEDDED PIPES <br />Section Page <br />64. General discussion_________nnnn____________________________ 120 <br />65. Development of Y curves_ __ _ __ __ _ ~ _ _ __ n __ __ __ _ _ _ __ __ __ __ _ _ __ __ 1-21 <br />h't <br />1. Solution of Yfor D2=O---------------------------------- 123 <br />h't <br />2, Solution of Yfor D'>O------------------ ,_______________ 125 <br /> <br />66. Development of Z curves__ _ __ _ __ _ __ __ __ _ _ _ _ _ _ _ __ __ __ __ __ __ _ _ __ _ 128 <br />67. Development of X curves_______________________________________ 129 <br />68. X, Y, and Z curves for bja not equal to 100_______________________ 130 <br />69. Example on use of X, Y, and Z curves____________________________ 134 <br />70. X, Y, and Z curves for a given installatioll_____________________ ___ 136 <br /> <br />CHAPTER ViI-EARLY STUDiES OF METHODS OF <br />COOLING HOOVER DAM <br /> <br />71. Preliminary investigations_________ ___n. _________ ________________ 141 <br /> <br />METHODS STUDIED <br /> <br />72. EIPbedded-pipe method__ _ u__________ _________ __ __ __ _ _ __ __ __ __ _ 142 <br />73. Air-cooled slot method_____uh ________________________________ 143 <br />1. Air cooling with individual refrigeration units in the slots_____ 143 <br />2. Cooling with a central refrigeration plant___________________ 144 <br />3. Feasibility of using air corr.pressors previously used for tunnel <br />excavation to furnish air for cooling dam___________________ 145 <br />74. Use of precooled aggregates__________________uu__ ____________ 145 <br />75. Use of precast concrete blocks_______.u_____u__________uu__u_ 147 <br /> <br />SUMMARY <br />76. Comparison of methods__ ____ ___ ____~_u__ u__ __ u __ __ u _ _ _ __ __ _ 147 <br /> <br />CHAPTER VIII-STUDIES OF EMBEDDED PIPE <br />SYSTEMS FOR HOOVER DAM <br /> <br />77. Value of a detailed cooling study_____-.:.___'___________________ 149 <br /> <br />BASIC DATA FOR A TYPICAL COOLING STUDY <br /> <br />78. Initial temperatures________________._.~-_______u_________u_____ _ 149 <br />79. Allowance for time lost between time of pJa.cing and tirre of cooling_ _ _ 151 <br />80. River water for cooling____________-____________u_______________ 151 <br />81. Refrigerated water for caoling_________~_________________________ 152 <br />82. Header system____ __ ______ ______ _____ ____ __ _ ____ _ _ uu ____ ____ _ 152 <br />83. Dimensions of cooling coils_________________________uu_________ 152 <br /> <br />DESCRIPTION OF A TYPICAL COOUNG STUDY <br /> <br />84. Layout of study ____' _ _____ _ _ ___ __ __u__ __ __ ____ _______________ 152 <br />85. Refrigeration capacity________________________________u_______. 155 <br />86, Cooling chart___ __ _________ ______ __ __ __ __ __ _______ __ __ __ __ __ __ _ 159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.