My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03789
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03789
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:52:09 PM
Creation date
10/11/2006 11:58:37 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.765
Description
White River General
State
CO
Basin
Yampa/White
Water Division
6
Date
8/16/1982
Author
Corps of Engineers
Title
Taylor Draw Reservoir Project - Environmental Impact Statement - Final
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5. Ground water wells to supply the water needs of <br />the town of Rangely <br /> <br />G, Infiltration galleries to supply the water needs <br />of the town of Rangely <br /> <br />7. No ActIon <br /> <br />All of the Issues and alternatives listed above were Investigated and <br />analyzed. These Issues are addressed In the appropriate section of <br />this EIS, as well as those required by law and regulation, and those <br />Identified during development of the document. <br /> <br />4. Summary of Environmental Impacts and Adverse Effects: The <br />envlrormental Impacts associated with the Proposed Actions and the <br />alternatives considered are summarized In Table 5 - 5 In Chapter 5 of <br />the Impact Statement, <br /> <br />5. Other Agency Actions Required: The following actions will be <br />required of other federal and state agencies: <br /> <br />,: CuI tural Resource Cl earance; <br /> <br />" Section 7 Clearance (Endangered or Threatened Species); <br /> <br />,: Right-of-Way Request - BlJo1; <br /> <br />,: Water Quality CertifIcation - State Health Department; <br /> <br />,: Plan and Specification approval - State Engineer; and <br /> <br />" Approval of Highway Re 1 ocat Ion - State Department of <br />Highways <br /> <br />G. Users Guide: This Final Envlrorvnental Impact Statement (FEIS) <br />supplements and updates the Taylor Draw Reservoir Project Draft <br /> <br />iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.