Laserfiche WebLink
<br />O~258_~ <br /> <br /> Year Year <br />Item 1990 2014 <br />Recreation/Dead Pool 2100 AF 1500 AF <br />Sedimentation 2046 AF 8440 AF <br />Rangely 1735 AF 1735 AF <br />Other Water Sales 21,520 AF 15,725 AF <br /> <br />2,3.4 Hydroelectric Generation Potential <br /> <br />2.3.4.1 A 2000 kw (7200 MJ) power plant would generate roughly 12.5 <br />million kwh (45 million MJ) on an average annual bas Is If the water <br />surface was maintained at 5335 feet (1750 m). The cost per kwh would <br />range between 20 and 22 mills. <br /> <br />2.3,5 Access Roads <br /> <br />2.3.5.1 The access roads required for Alternative B would be the same <br />as Alternative A except 5800 lineal feet (1763 m) of Colorado Highway <br />64 would have to be relocated Instead of 3500 lineal feet 1067 m). <br /> <br />2.3.6 Applicants Proposed Mitigation Measures <br /> <br />2.3,6.1 Revegetation - The appl icant proposes to revegetate all <br /> <br />borrow areas above the high water line after construction. <br /> <br />2.3,6.2 Fishery Facilities - The outlet works concept Is the same as <br /> <br /> <br />Alternative A, thus no problem with fish being drawn through the <br /> <br /> <br />trashracks is foreseen. <br /> <br />I <br />I . <br /> <br />2.3.6.3 Additional Mitigation Measures - Additional discussion on <br />mitigation measures may be found In Chapter 5. <br /> <br />2.3,7 Comparative Cost <br /> <br />2.3.7,1 The estimated annual cost per acre-foot In 1980 dollars less <br />engineering and construction management for Alternative B would be <br /> <br />21 <br /> <br />; , <br />.li,...:" <br />