My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03785
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03785
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:52:07 PM
Creation date
10/11/2006 11:58:32 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8543.200
Description
Projects in the Closed Basin
State
CO
Basin
Rio Grande
Water Division
3
Date
1/1/1957
Title
Work Plan - 1957
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />XII. Experiment IX - Field Capacity and Wilting Point Determinations: <br /> <br />A. Objectives: <br /> <br />To determine field capacities and wilting points of represent- <br />ative soil at varying depths to correlate with tensiometer readings <br />as an aid in obtaining efficient irrigation management. <br /> <br />B. neneral Procedure: <br /> <br />1. Field capacity determinations. <br />l'oisture determinations will be made for the following <br />depths: 6-18", 18-30", .3O-L2", am L2 -54". The moisture <br />samples will be taken approximately 24 hours after an irri- <br />gation has been applied from the plots in which tensiometers <br />have been installed. <br />2. !!lilting point determinations. <br />The wilting point will be detemined on a portion of the <br />sample used to determine field capacity by growing a sunflower <br />in a can until it is permanently wilted. <br /> <br />C ~-~'}5~0 <br />.i '~_ ......-1...., v..... <br /> <br />-10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.