Laserfiche WebLink
<br />A <br /> <br />790 tons <br />~ <br />Site AR34.5 <br /> <br />Iron <br /> <br />194 tons <br />~ <br />25 percent <br />Site AR31.0 <br /> <br />596 tons ~ 75 percent <br /> <br /> <br />Terrace Reservoir <br /> <br />... <br />B,f.; ~ <br />~?..., qif/ ~ <br /> <br />60,000 <br /> <br />~;~ <br />~q< <br />.A <br /> <br />~~ <br />!(--:;.,.'> <br />~i'"' <br /> <br />R-~ <br />&~,;\ <br />~H. <br /> <br />BASE FlOW <br />(AR31.0) <br /> <br />50.000 <br /> <br />_ AR34.5 <br />_ AR31.o <br /> <br />~ <br />c <br />'" <br />~ 40,000 <br />'" <br />c <br />Z <br />::> <br />12 <br /> <br />~ 30,000 <br /> <br />g <br />~ <br />~ <br />_ 20.000 <br />~ <br />~ <br />g <br /> <br />10,000 <br /> <br /> <br />s <br /> <br />o <br /> <br />N <br /> <br />o <br /> <br />J <br /> <br />F <br />1995 <br /> <br />M <br /> <br />Figure 12. Annual (A) and dally (B) total-Iron loads into (site AR34.5) and out of (site AR31.0) Terrace Reservoir, <br />April 1994 through March 1995. <br /> <br />METAL LOADS INTO AND OUT OF TERRACE RESERVOIR 31 <br /> <br />003188 <br />