My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03769
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:52:01 PM
Creation date
10/11/2006 11:57:39 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Rates
Basin
Colorado Mainstem
Date
9/1/1975
Author
USDOI/BOR
Title
CRSP and Participating Projects - Tenative Power Rate Ajustment
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COP Y <br /> <br />DEPARTMENT OF THE INTERIOR <br /> <br />Bureau of Reclamation <br /> <br />GENERAL ADJUSTMENTS IN POWER RATES <br /> <br />.' <br /> <br />Notice of Final Procedures for Public Participation <br />in General Adjustments in.Power Rates <br /> <br />On May 21, 1975, the Bureau of Reclamation published in the <br /> <br />Federal Register a draft of "Proposed Procedures for Public <br /> <br />Participation in General Adjustments in Power Rates," 40 F.R. 22156. <br /> <br />On June 16, 1975, a short notice was published that corrected the <br /> <br />omission of the name of the Bureau from the title and extended the <br /> <br />time for public comment to July 7, 1975. <br /> <br />Fifteen communications were received in response to these <br /> <br />notices. <br /> <br />A detailed review of these comments was made, and copies of the <br /> <br />comments and of that review are available for public inspection at <br /> <br />the office listed below. <br /> <br />Chief, Division of Power <br />Bureau of Reclamation, Room 7612 <br />Department of the Interior <br />Washington, D.C. 20240 <br />Telephone: (202 343-5337 <br /> <br />Based on the review, the final procedures have been adopted and <br /> <br />appear below. The principal changes made from the proposed <br /> <br />procedures as a result of the review include clarification of the <br /> <br />COP Y <br /> <br />51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.