My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03746
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03746
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:51:54 PM
Creation date
10/11/2006 11:56:20 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.42.A
Description
Little Snake/Green River
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1994
Author
USDOI/FWS
Title
1994 Upper Green River Trip
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LonQ-Term Facilitv Needs Based on ProDosed EndanQered Fish Needs <br /> <br />Razorback Sucker - Colorado Waters <br /> <br />17.5 Acres <br /> <br />Bony tail - Colorado Waters <br /> <br />19.1 Acres <br /> <br />Bony tail - Utah Waters <br />Colorado Squawfish - Colorado Waters <br />Tota 1 <br /> <br />6.5 Acres <br /> <br />0.15 Acres <br /> <br />43.25 Acres <br /> <br />NOTE: This space need is for proposed augmentation and restoration <br />stocking in the upper basin if the fish were to be reared at <br />one time. <br /> <br />Estimated Construction Costs <br /> <br />Facil itv <br />Ouray Endangered Fish Facility <br /> <br />Estimated Cost <br /> <br />1 Hatchery Building (Complete) <br />1 Shop and Garage Building <br />Sh'op Equ i pment <br />1 Residence <br />12 0.2-Acre Ponds <br />24 O.l-Acre Ponds <br />Engineering Costs & Contingencies (25%) <br /> <br />Total <br /> <br />$ 500,000 <br />$ 100,000 <br />$ 25,000 <br />$ 100,000 <br />$ 566,440 <br />$ B20,800 <br />$ 343,050 <br /> <br />$ 1,715,200 <br /> <br />Wahweap State Fish Hatchery * <br /> <br />24 0.2-Acre Ponds <br />Develop Wells <br /> <br />Total <br /> <br />$-924,000 <br />$ 100,000 <br />$1,024,000 <br /> <br />Craig Municipal Facilites * <br /> <br />26 0.2-Acre Ponds <br />Water Supply Lines <br />Wells <br /> <br />Total <br /> <br />$ 900,000 <br />$ 250,000 <br />$ 200,000 <br />$1,350,000 <br /> <br />* NOTE: Engineering planning and designs are being done with <br />FY 94 funds from the Bureau of Reclamation. The costs <br />from planning and design may differ from the figures <br />above that are based on construction at Ouray. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.