My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03730
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03730
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:51:49 PM
Creation date
10/11/2006 11:56:00 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1983
Author
BOR
Title
Grand Valley Salt Pickup Calculations - draft report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,~;;iJ <br /> <br />. :_.::.:>J <br />.,.... <br /> <br />}~.:~~': <br /> <br />r-- <br />e,,:l <br />~ <br /> <br />OJ <br /> <br />CHAPTER II <br /> <br />GRAND VALLEY RIVER BUDGET <br /> <br />in Table 1 and locations are shown on Figure 2. The period of 1952 through <br /> <br />1980 was selected for analysis because 1952 was the first year that all the <br /> <br />river stations had data. <br /> <br />Given the combination of available data at a station, there are a number <br /> <br />of different methods for estimating the salt load. As noted before, the USGS <br /> <br />developed a number of estimates of salt pickup in Grand Valley, each based on <br /> <br />a particular method. Since the available data varies from station to <br /> <br />station, and even from period. to period at a given station, an attempt has <br /> <br />been made to improve these estimates by defining a data availability case for <br /> <br />each dsy, and applying the best method for that particular data situation. <br /> <br />Hence, the loading at each station was est1m8.ted on a daily basis by applying <br /> <br />different methods for different portions of the record, 8S opposed to using a <br /> <br />single method for the entire period of record. The details of this approach <br /> <br />are presented in the appendi~. <br /> <br />Prior to 1969, composite water quality samples were taken. In <br /> <br />succeeding years,. instantaneous grab sampling methods were used. Composite <br /> <br />samples were normally taken over a 10 to 30 day period. For this study all <br /> <br />samples were treated as instantaneous, the beginning date of the composite <br /> <br />sample being considered as the date for. the instantaneous grab sample. This <br /> <br />assumption may introduce s slight error in the analysis on a monthly basis, <br /> <br />since, in effect, the date of the sampling was moved 5 to 15 days early (i.e. <br /> <br />1/2 the period of the composite sample). For this study, however, only a <br /> <br />mean annual value is sought and refining the analysis to account for the <br /> <br />composite sampling was not considered necessary. <br /> <br />U-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.