<br />28
<br />
<br />RUEDl DAM AND RESERVOIR, COLO.
<br />
<br />area is timber or grazing land. Clearing of about 600 ncres of medium
<br />timber will be necessarv, It will be necessary also to relocate approxi-
<br />mately 7% miles of two-lane, gravel-surfaced, State Highway No.
<br />104 which now traverses the reservoir area and a like mileage of
<br />telephone line.
<br />. The nearest railhead is a branch line of the Denver & Rio Grande
<br />1Vestern Railroad at nasalt, Colo., slil(htly more than 14 miles from
<br />the damsite via State Highway 104, The nearest source of electric
<br />power is the Pnblic Service Co. 'of Colorado's 115-kilovolt transmission
<br />line about 1 mile away.
<br />There are no adequate li,,--ing qnarters near the reservoir site for
<br />construction personnel. The cost estimate provides for adequate
<br />housinl(. Most of these units will be temporary type for use during
<br />construction. One will be perml1nent type so as to provide continued
<br />housing for a dam tender after completion of construction.
<br />
<br />C08t8
<br />The cost estimate for Ruedi Dam and Reservoir is of reconnaissance
<br />grade and is based on construction prices as of January 1959. A
<br />summary of the estimate follows:
<br />
<br />",
<br />
<br />Identified property and amount
<br />lLand nnd rigbt8_______________~_________________________________
<br />)R~loc8tion8 ____________________________________________________
<br />Clea ring lands _ _____ _ _________ ______ ______ _____ ___ ______________
<br />Dam, outlet works, and splllway__________________________________
<br />General property and service facilitie:i____________________________
<br />Investigations, engineering, and other cost::l_______________________
<br />Recren tion facHl tles______________________ _______________________
<br />
<br />$185,000
<br />360,000
<br />] 50, 000
<br />9,650,000
<br />336.000
<br />2,095,000'
<br />55,000
<br />
<br />Estimated project cosL____________________________________ 12,831,000
<br />The operating principles specify that Ruedi Dam and Reservoir
<br />must be in operation before diversions of water are made to the eastern
<br />slope by the Fryingp,m-Arkansas project. As scheduled in the con-
<br />struction program for the Fryingpan-Arkansas project, the total con-
<br />struction penod covers 6 years. The first year would be devoted
<br />mainly to preconstruction activity, the following 4 years to active con-
<br />strucllon of the dam and reservoir, and the sixth year to minor work of
<br />completion, Construction funds are scheduled as follows:
<br />
<br />Fiscal year: .d.mounf Fiscal year-Con. Amounf .~
<br />1~u2___________________ $500,000 1965__________________ $3,000,000
<br />1n63___________________ 3.350,000 1966__________________ 2,040,000
<br />1964___________________ 3,686,000 1967__________________ 255,000
<br />Estimated annual operation, maintena.nce, and replacement costs
<br />total $19,700, consisting of $9,200 on the dam and reservoir and
<br />$10,500 on recreation facilities. The last sum includes $7,500 for
<br />administ.rat.ion, operation, and ma.intena.nce and $3,000 for replace-
<br />ment. The construction costs, interest during construction and oper-
<br />. ntion, maintenances, and replacement. a.re subject to allocation be-
<br />tween the Fryingpan-Arkansas project aud western-slope uses of the
<br />reservoir.
<br />
|