Laserfiche WebLink
<br />28 <br /> <br />RUEDl DAM AND RESERVOIR, COLO. <br /> <br />area is timber or grazing land. Clearing of about 600 ncres of medium <br />timber will be necessarv, It will be necessary also to relocate approxi- <br />mately 7% miles of two-lane, gravel-surfaced, State Highway No. <br />104 which now traverses the reservoir area and a like mileage of <br />telephone line. <br />. The nearest railhead is a branch line of the Denver & Rio Grande <br />1Vestern Railroad at nasalt, Colo., slil(htly more than 14 miles from <br />the damsite via State Highway 104, The nearest source of electric <br />power is the Pnblic Service Co. 'of Colorado's 115-kilovolt transmission <br />line about 1 mile away. <br />There are no adequate li,,--ing qnarters near the reservoir site for <br />construction personnel. The cost estimate provides for adequate <br />housinl(. Most of these units will be temporary type for use during <br />construction. One will be perml1nent type so as to provide continued <br />housing for a dam tender after completion of construction. <br /> <br />C08t8 <br />The cost estimate for Ruedi Dam and Reservoir is of reconnaissance <br />grade and is based on construction prices as of January 1959. A <br />summary of the estimate follows: <br /> <br />", <br /> <br />Identified property and amount <br />lLand nnd rigbt8_______________~_________________________________ <br />)R~loc8tion8 ____________________________________________________ <br />Clea ring lands _ _____ _ _________ ______ ______ _____ ___ ______________ <br />Dam, outlet works, and splllway__________________________________ <br />General property and service facilitie:i____________________________ <br />Investigations, engineering, and other cost::l_______________________ <br />Recren tion facHl tles______________________ _______________________ <br /> <br />$185,000 <br />360,000 <br />] 50, 000 <br />9,650,000 <br />336.000 <br />2,095,000' <br />55,000 <br /> <br />Estimated project cosL____________________________________ 12,831,000 <br />The operating principles specify that Ruedi Dam and Reservoir <br />must be in operation before diversions of water are made to the eastern <br />slope by the Fryingp,m-Arkansas project. As scheduled in the con- <br />struction program for the Fryingpan-Arkansas project, the total con- <br />struction penod covers 6 years. The first year would be devoted <br />mainly to preconstruction activity, the following 4 years to active con- <br />strucllon of the dam and reservoir, and the sixth year to minor work of <br />completion, Construction funds are scheduled as follows: <br /> <br />Fiscal year: .d.mounf Fiscal year-Con. Amounf .~ <br />1~u2___________________ $500,000 1965__________________ $3,000,000 <br />1n63___________________ 3.350,000 1966__________________ 2,040,000 <br />1964___________________ 3,686,000 1967__________________ 255,000 <br />Estimated annual operation, maintena.nce, and replacement costs <br />total $19,700, consisting of $9,200 on the dam and reservoir and <br />$10,500 on recreation facilities. The last sum includes $7,500 for <br />administ.rat.ion, operation, and ma.intena.nce and $3,000 for replace- <br />ment. The construction costs, interest during construction and oper- <br />. ntion, maintenances, and replacement. a.re subject to allocation be- <br />tween the Fryingpan-Arkansas project aud western-slope uses of the <br />reservoir. <br />