My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03707
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03707
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:51:43 PM
Creation date
10/11/2006 11:55:09 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Water Division
5
Date
3/7/1960
Author
Acting Secretary of
Title
Letter from Acting Secretary of the Interior transmitting a Report and Findings on Ruedi Dam and Reservoir Colo Pursuant to the Federal Reclamation Laws
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />iOG5 <br /> <br />RUEDI DAM AND RESERVOIR, COLO. <br /> <br />25 <br /> <br />" <br /> <br />14, The project is to be operated in such a manner as to secure the <br />greatest benefit from the use and reuse of imported project waters <br />within project boundaries in the State of Colorado. <br />15. Any and all benefits and rights of western Colorado water users <br />in and to water stored in Green Mountain Reservoir, as described and <br />defined in Senate Document 80, 75th Congress, 1st session, shall not be <br />impaired or diminished by this project. <br />16, The project, its operation, maintenance, and use shall be subject <br />to the prOVIsions of the Upper Colorado River Basin compact of Octo- <br />ber 11, 1948 (Public Law 37, 81st Cong" 1st sess.), llnd the Colorado <br />Ri,'er compact of November 24, 1922 (H. Doc. 005, 6ith Cong., 4th <br />sess.). The project shall always be operated in accordance with the <br />laws of the State of Colorado, and in accordance with the dCCI'ees of <br />the State courts of Colorado and decisions of the Colorado State <br />engineer. <br />17. The Colorado River 'Vater Consermtion District of the State <br />of Colorado shall acquire title to storage of water in Ruedi Reservoir <br />and any reservoir constructed in addit.ion thereto, by appropriate <br />proceedings in the courts of the State of Colorado. The Southeastern <br />Colorado 'Vater Conservancy District. of the St.ate of Colorado shall <br />likewise acquire title to the water required by t.he project for diversion <br />t.o the Arkansas Valley. The Secretary of the Interior shall at any <br />time after the authorization of the project have the option to obtain <br />or require the transfer to the United States of any and all rights <br />initiated or acquired by appropriation as herein set forth: Provided, <br />however, That the rights so taken shall be subject to a beneficial use <br />of such water as may be provided in the repayment contract or con- <br />tracts, and subject to all the operating princ'pJes herein set fort.h. <br />18. No transmountam diversion of water shall eyer be maue through <br />the collection and diversion system of the Fryingpan-Arkansas proj- <br />ect in excess of the quantitative limitations and conditions established <br />by this document. 'Vhcnever, however, under the III WI:; of the Stute <br />of Colorado there may be additional water available for such collec- <br />tion and diversion which is not at the time of diversion required for <br />beneficial use in western Colorado or for filling interstate water COIn- <br />pact a/$"reements, then such water may be collected and diverted for <br />"'-___henefici.al-us"-in-th"-A.k<H>S"s-V,,ney-:--P~'017ided,hO'rJ)emr:; Thar-Builh <br />11: _ additional diversion shall only be made with the mutual consent of <br />;1 each of the following agencies of the State of Colorado, to wit: the <br />,~ Colorado 'Varer Conservation Board, the Southwestern Water Con- <br />If, servation District, the Colorado River Water Conservation District, <br />and the Southeastern Colorado Water Conservancy District. <br />19. To assure project operation in conformity with the operating <br />principle heretofore stated, to provide a means for the collection and <br />mterchange of information, and to provide a method for the continued <br />study of project operations to the end that, if the stared operating <br />principles may be improved upon,. recommendations for changes may <br />be mude to the contracting parties, a commission shall be created in <br />an appropriate mallner to be composed of one representative of the <br />Southeast.ern Colorado Water Conservancy DistrICt, one representa- <br />tive of the Colorado River Water Conservation District, two repre- <br />sentatives of the United States, and one representative of tlte State of <br />Colorado appointed by the Colorado 'Vater COllservation Board after <br />:'i23:'i1-60-3 <br /> <br />s. <br /> <br />l <br />~ <br /> <br />-:. <br />
The URL can be used to link to this page
Your browser does not support the video tag.