Laserfiche WebLink
<br />........_._----~~. <br /> <br />w <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Total Installation Cost I <br />I <br />annual) I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Net Benefits (avg annua1)\ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Item <br /> <br />Benefi ts (avg. <br />On-fann <br />Downstream <br />Employment <br />Total <br /> <br />Costs (avg. annual) <br /> <br />Sa 1t Reducti on <br /> <br />Salt Reduction at <br />Imperial Dam (Concentra- <br />tion) <br /> <br />~.) <br /> <br />( - <br />r~,Conversion to Upland <br />,.!:'~ Wi 1 d1 He Habi tat <br />c: <br />~10n-fann Irrigation <br />Improvements <br /> <br />Energy Requirements <br /> <br />UINTAH BASIN SALINITY CONTROL STUDY <br />SUMMARY OF SIGNIFICANT EFFECTS <br /> <br />Unit <br /> <br />$1,000 <br /> <br />$1,000 <br />$1,000 <br />$1,000 <br />$1,000 <br /> <br />$1,000 <br /> <br />$1,000 <br /> <br />Tons/yr. <br /> <br />mg/l <br /> <br />Acres <br /> <br />Acres <br /> <br />MWh/yr. <br /> <br />I <br />I <br />I <br />I <br />I Future wi thout <br />I a project <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />BASIN TOTAL <br /> <br />A1 ternative <br /> <br />Fanner Identified <br />Irrigation Improvements <br /> <br />9,601 <br /> <br />55,330 <br /> <br />1,717.0 <br />1,036.8 <br />159.3 <br />2,913.1 <br /> <br />5,230.6 <br />3,562.7 <br />966.1 <br />9,759.4 <br /> <br />6,700.6 <br /> <br />3,058.8 <br /> <br />82 , 900 <br /> <br />9.8 <br /> <br />1,095.1 <br /> <br />1,818.0 <br /> <br />21,000 <br /> <br />2.8 <br /> <br />5,290 <br /> <br />18,180 <br /> <br />23,000 <br /> <br />128,300 <br /> <br />5,200 <br /> <br />19,500 <br /> <br />Potenti al <br />Irrigation <br />Improvements <br /> <br />61,039 <br /> <br />5,996.4 <br />4,562.6 <br />1,060.8 <br />11,619.8 <br /> <br />7,497.0 <br /> <br />4,122.8 <br /> <br />98,900 <br /> <br />12.5 <br /> <br />22,470 <br /> <br />144,700 <br /> <br />31,200 <br /> <br />Se 1 ected <br />Plan <br /> <br />52,389 <br /> <br />4,901.7 <br />3,759.7 <br />917.2 <br />9,578.6 <br /> <br />6,394.1 <br /> <br />3,184.5 <br /> <br />76,600 <br /> <br />10.3 <br /> <br />19,860 <br /> <br />122,200 <br /> <br />22,600 <br /> <br />(Revised November 1980) <br />