My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03638
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03638
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:51:22 PM
Creation date
10/11/2006 11:53:33 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
4/1/1987
Author
DOI BOR
Title
Salinity Update - April 1987 - A Quarterly Report on the Colorado River Water Improvement Program
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.... <br />0') <br />w <br />00 <br /> <br />from the proposed Towaoc-High- <br />line Canal (a Dolores Projecf tea. <br />ture) 10 serve the Rocky Ford <br />OUch service area The Rocky <br />Ford Dilch would then be aban. <br />doned as part 01 the plan. and its <br />flows would be combined into <br />the proposed Towaoc-Highline <br />CanaL These portions of fhe <br />McElmo Creek Unit have been <br />authorized for construction as <br />part ollhe Dolores ProJecl. <br />The McErmo Creek USDA <br />salinity control report was <br />publiShed in 1983 The recom- <br />mended implementation plans <br />call lor treatmenl or about 19.700 <br />acres with sprinkler irrigation sys- <br />lems and about 270 miles of on. <br />farm ditch and laferal lining <br />By combining the USSR anti <br />USDA projects In this area. the <br />more eNlclem gravity pressure <br />sprinkler systems can be in. <br />sfalled 10 an acldillonal 9.000 <br />acres over the original USDA 1m. <br />p1ementation plan: The USDA im. <br />plementation schedule will <br />provide for coordinaled onfarm <br />and off. farm planning <br /> <br />Meeker Dome <br /> <br />Meeker Dome is a local an- <br />liclillal uplift ili northwestern <br />Colorado and is Ihe site of <br />several abandoned oil And gAS <br />exploralory wells During verifica. <br />lion studies. (he abandoned <br />SCOll. James. and Marland oil <br />wells were cleaned And plugged <br />AI the end of FY 1985, monitor- <br />ing of seeps and wells was ter. <br />minaled Waler levels in the ob- <br />servalion wells had stabiliZed and <br />springs and seeps remained dry <br />or Iilled with standing water in- <br />dicating the well plugs remained <br />intacl The estimaled cosl E"ffE"c- <br />tiveness 01 this 19,000 tons reduc- <br />tion is about $t4 per Ion A plan. <br />ning report concluding lhe Sludy <br />was published in July 1985 <br /> <br />Moapa Valley (USDA) <br /> <br />The project coverS a 5.000. <br />acre irrigated area on Muddy <br />River upslream of Lake Mead <br />The project includes installation <br />01 17 miles 01 underground piped <br />delivery system. onfarm waler <br />managemenl. and salinity conlrol <br />practices By reducing overirriga- <br />tion and excessive deep percola. <br />tlon. the average annual salt load <br />is expecled to be reduced by <br />19.200 Ions This unit has met <br />the prerequisite for construction <br />and Is awaiting funding SCS <br />publiShed its report on Moapa <br />Valley In February 1981 <br /> <br />Palo Verde Irrigation <br />District (USSR and <br />USDA) <br /> <br />The Palo Verde Irrigalion Dis. <br />Irict is a privalely developed dis. <br />triCI in Riverside and Imperial <br />Counties. California Water for ir. <br />rigatlon is diverted from Ihe <br />Colorado River at the Palo Verde <br />Diversion Dam and is conveyed <br />through 295 miles 01 main canals <br />and lalerals to serve approximate- <br />ly 91.400 acres 01 irrigated land <br />within the dislrict The irrigation <br />return flows are collected in a <br />153-mile drainage system and <br />returned 10 the Colorado River; <br />however. the reI urn flows are 10' <br />cated below many of Ihe areas <br />impacted by salinity and would <br />not have Ihe full benefits of an <br />upslream project <br />An analysis based on 1974 <br />operational data indicated Ihat <br />152.000 tons of salt was lhe net <br />discharge to the river The PalO <br />Verde subarea alone discharged <br />144,000 Ions annually <br />In 1985. $CS and Reclamafion <br />lormulated a joint pfan 01 Sludy <br />SCS will provide Reclamation <br /> <br />with onfarm, onsile evaluations <br />and analyses relative 10 irrigation <br />efficiencies. deep percolation. <br />and prospects for imprOved on. <br />farm managemenl The USDA <br />portion 01 the evaluation has not <br />yet been IUnded pending the out. <br />come of Reclamation's Phase I <br />work. Reclamation completed <br />the shallow well drilling for the <br />verification program in May 1985 <br />and Is sampling Ihe test wells. <br />During 1987. Reclamation ac- <br />tivities will complete Phase I work <br />in developing hydrosalinily <br />analysis for the PVID 10 deter- <br />mine lhe moVemenls of ground <br />water and source 01 salt load- <br />ings The study will provide infor- <br />mation for Reclamation. USDA. <br />and the PVID to determine <br />salinity control program com- <br />ponents and the need lor lurther <br />sludles <br /> <br />Paradox Valley <br />(USSR) <br /> <br />Paradox Valley. a collapsed <br />salt anticline. is a northwest- <br />southeast trending valley 3 10 5 <br />miles wide in soufhwesfern <br />Colorado Ground water comes <br />into contact with Ihe top ollhe <br />salt lormation where it becomes <br />nearly saturated with sodium <br />chloride and surfaces in Ihe <br />Dolores River channel in Paradox <br />Valley Studies condUCled by lhe <br />Bureau of Reclamation have indi- <br />cated lhal lhe river picks up o\ler <br />205.000 Ions of salt annually as il <br />passes fhrough the valley <br />The ongoing lesting program <br />consists 01 verificalion Clnd refine- <br />ment of controlling brine inflow <br />to Ihe river. design data collec- <br />lion lor future facilities. and drill- <br />ing and testing an injection well <br />Reclamation is using outside con. <br />sultants for ils fechnical assis- <br />tance on deep well injection A <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.