My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03637
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03637
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:51:22 PM
Creation date
10/11/2006 11:53:32 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.700
Description
Fryingpan-Arkansas Project - Annual Operating Plans and Reports
State
CO
Basin
Arkansas
Water Division
5
Date
11/1/1971
Author
US DoI BoR
Title
Annual Operating Plan Fryingpan-Arkansas Project Colorado 1971 -1972
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />1 <br />. <br /> <br /> <br />09G3 <br /> <br />ANNUAL OPERATING PLAN <br />FRYINGPAN-ARKANSAS PROJECT, COIDRADO <br />1971 OPERATIONS <br />19720UTIDOK <br /> <br />General <br /> <br />/> ) <br />This is the (third "Annual Operating plan far the Fryingpan - Arkansas praject <br />which, when campleted, willcansistaf federally awned dams, reservairs, canals, <br />tunnels, pumping plants, hydroelectric pawerplants, electric transmissian lines, <br />substatians, and ather facilities. As indicated by the enclased praject map, <br />these features are .or will be lacated in the Raaring Fark Basin .of the Calarada <br />River Basin and in the Arkansas River Basin, central and sautheastern Calarada, <br />respecti vely. <br /> <br />These extensive warks will ultimately make passible the .orderly and beneficial <br />use .of water far irrigatian, hydraelectric pawer generatian, fish and wildlife <br />preservatian, and municipal and industrial uses, and pravide flaad cantral and <br />ather callateral benefits. <br /> <br />Currently, the .only praject features in aperatian are Ruedi Reservair and Tur- <br />quaise Lake. Althaugh last year's Annual Operating Plan anticipated initial <br />transmauntain diversian thraugh Charles H. Baustead Tunnel, na diversian was <br />passible due ta canstructian delays. The present pragram schedule shaws the <br />Charles H. Baustead Tunnel ready far aperatian early in May .of 1972. Therefare, <br />1972 will be the first year .of Fryingpan-Arkansas praject transmauntain diver- <br />sian. Since the Sauth Side Callectian System is campleted fram the west partal <br />.of Charles H. Baustead Tunnel ta Chapman Gulch, it is expected that imparts <br />will be made fram that partian .of the system in 1972. <br /> <br />Ruedi Reservair will be .operated far praject replacement purpases if needed, <br />and far same flaad cantral benefits and fish and wildlife and recreatian enhance- <br />ment. Until the amaunt .of starage space required far replacement .of praject <br />diversians has been determined, the Bureau .of Reclamatian cannat negatiate any <br />firm cantracts far sale .of Ruedi Reservair starage water. The Bureau is cur- <br />rently canducting studies ta determine the amaunt .of replacement starage space <br />required. <br /> <br />Turquaise Lake will be .operated far regulatian .of praject water and far regula- <br />tian .of nanpraject water an a service basis, as well as far incidental fish and <br />wildlife and recreatian purpases. <br /> <br />4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.