Laserfiche WebLink
<br />. <br /> <br />""" <br />Q <br />W <br />..(;:I.. <br /> <br />.J <br /> <br />. <br /> <br />ANTICIPATED EFFECTS OF ADDITIONAL OEVELOPMENTS (continued) <br /> <br />total of 150,000 acre-feet (185 x 106m3) depletion exclusive of Fon- <br />tenelle evaporation is anticipated. Of this, an estimated 6,000 acre- <br />feet C7 x 106m3) is planned for wildlife purposes while the remaining <br />144,000 acre-feet (178 x 106m3) of depletions was assumed to be for <br />industrial purposes. Irrigation, however, may not yet be completely out of <br />the picture. Industrial users include Pacific Power & Light Co., Sun Oil, <br />and J'ossibly other industries. It is assumed the 6,000 acre-feet C7 x <br />106m3) of water for refuge purposes would neither pick up nor lose salts, <br />but the remaining water for industrial purposes would deplete the salts as <br />well as the water. The salinity concentration in the future at the Green <br />River, Wyoming, gage would remain almost the same as at present because <br />diversions to industries are anticipated to be located not too far above <br />the gage. <br /> <br />Private Industrial Rights. These <br />for mineral development, particularly <br />Total future depletions are expected to <br />by the year 2010. <br /> <br />rights are expected to be utilized <br />for trona mining and processin~. <br />reach 57,000 acre-feet (70 x 106m) <br /> <br />2. Between Green River at Green River, Wyoming, and Green River near <br />Greendale, Utah <br /> <br />Lyman Project. This is a multipurpose project located in southwestern <br />'vyarning. Project facilities consist of two dams and reservoirs. One is <br />located at the Meeks Cabin site on the Blacks Fork in Wyoming and provides <br />33,000 acre-feet (41 x 106m3) of storage capacity. The other has been <br />constructed at the State line site of the East Fork oE Smith Fork in Utah <br />and will provide 14,000 acre-feet 07 x 106m3) of storage capacity. The <br />project when completed will have the primary purpose of providing supple- <br />mental water to 36,000 acres Os 000 ha) of existing fannhnd along with <br />fish and wildlife and recreation benefits. This project will present an <br />opportunity to study the water quality effects of adding supplemental water <br />to lands already irrigated. Of the 10,000 acre-feet (12 x 106m3) total de- <br />pletions, only 4,000 acre-feet (5 x 106m3) remain since 6,000 acre-feet <br />(7 x 106m3) from Meeks Cabin Reservoir is now depleted. <br /> <br />Utah Power & Light Co. This steam powerplant (Viva Naughton) is <br />located at Kemmerer, Wyoming, with present depletions of about 6,000 <br />acre-feet C7 x 106m3). Total future depletions of this plant are ex- <br />pected to increase to 14,000 acre-feet (17 x 106m3 by the year 2000. <br /> <br />3. Above Yampa River near Maybell, Colorado <br /> <br />Hayden and Craig Steam Powerplants. The addition of new units will <br />require an estimated 20,000 acre-feet (25 x 106m3) of water by 1990. <br />Present depletions amount to 10,000 acre-feet (12 x 106m3). It is assumed <br />the plants will return no salt or water. <br /> <br />48 <br />