My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03594
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03594
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:51:11 PM
Creation date
10/11/2006 11:51:31 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.600
Description
Colorado River Basin Salinity Control - Federal Agencies - USDA
Basin
Colorado Mainstem
Water Division
5
Date
9/17/1991
Title
Colorado River Salinity Control Program - Lower Gunnison No 2 - Montrose County
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />./;'~t}; <br />......:'.. <br /> <br />W. <br />N <br />~ <br />W. <br /> <br />RATING FACTORS <br /> <br />TYPE OF PROJECT: <br /> <br />Group projects "that must pe installed prior to individual on farm <br />projects will receive additional priority points. Individual on <br />farm projects that rely on the group project can then be attached <br />properly to the group project (4 extra points are assigned). <br /> <br />PRIORITY AREA: <br /> <br />WS008 ---------- 18 points <br />WSOll ---------- 15 points <br />WS007 ---------- 12 points <br />WS020 ---------- 09 points <br />WS019 ---------- 06 points <br />WS012 ---------- 03 points <br /> <br />SCOPE OF WORK: <br /> <br />Salt reduction and wildlife --------- 15 points <br />Salt reduction only ----------------~ 10 points <br />Wildlife only ----------------------- 03 points <br /> <br />~::'\ <br />::,:,.:..:.:. <br /> <br />SCHEDULE OF APPLICATION: <br /> <br />Less than 5 years ------------------- 05 points <br />More than 5 years ------------------- 03 points <br /> <br />EXTENT OF SALINITY CONTROL WORK DONE: <br /> <br />More than 50% ----------------------- 05 points <br />Less than 50% ----------------------- 03 points <br /> <br />COORDINATION WITH ANOTHER PROJECT: <br /> <br />Yes --------------------------------- 05 points <br />No ---------------------------------- 01 point <br /> <br />SIGNUP PERIOD: <br /> <br />All applications will be serviced according to ranking after applying <br />the above rating system to each. High priority jobs will be planned before <br />proceeding to lower priority jobs. Applicants unable to make firm planning <br />jecisions will be serviced when decisions can be made. Applications not <br />serviced during their first year of sign up will be given an additional 5 <br />points once only. A secondary priority system based on cost per ton of <br />salt reduction will be used when there are more salt plans than funds for <br />contracting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.