My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03573
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03573
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:51:06 PM
Creation date
10/11/2006 11:49:56 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1977
Author
USDOI
Title
21st Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />POWER REPAYMENT STUDY <br /> <br />Following are explanatory notes on the terms <br />used on the graph. Copies 01 the power <br />repayment study in a highly detailed form can <br />be obtained upon request. <br /> <br />Results 01 the power repayment study lor f,scal <br />year 1977 are depicted In the graph on page 34 . <br />EstImated annual power revenues are shown <br />together With their appllcalfon TOlal revenues <br />lor the penod shown exceed $46 billion. After <br />repayment 01 about $970 million for the power <br />Investment and replacements and $330 million <br />for Interest, power revenues should be <br />suffiCient to repay about $70 million In irnga~ <br />tlon COSIS and provide around $1.6 billion lor <br />aSSIstance in repayment at participating <br />prOJects <br /> <br />OPERA T1NG EXPENSES <br /> <br />Annual costs of power and salinity control <br />operation and maintenance. <br /> <br />WHEELING <br /> <br />The annual cost of wheeling by others. <br />Beginning With fiscal year 1990, payments are <br />assumed to the Parker-DavIs Project In the <br /> <br /> <br />Lower Colorado RegIon and the Pick-Sloan <br />Program in the Lower MISSOUri Region for <br />wheeling power over their facilities <br /> <br />ENERGY PURCHASES <br /> <br />Annual costs of purchases lor firming energy, <br />lor luel conservation, and lor energy to replace <br />the delrciency in Hoover Dam power plant <br />generation caused by storage project oper- <br />ations In past years, energy purChases for fuel <br />conservahon are shown as an energy purchase <br />e)(pense and the revenues from energy sales <br />for fuel conservation are included In the gross <br />revenues. In future years. It was assumed that <br />there would be no energy purChAses for fuel <br />conservation, <br /> <br />REPLACEMENTS <br /> <br />Payments made on power replacements With <br />the highest interest-bearing component <br />(whether replacements or other power invest- <br />ment) being paid Ilrst. <br /> <br />POWER INTEREST PA YMENTS <br /> <br />Annual interest on the unpaid power <br />Investment. <br /> <br />Sw,rchYilrd on carlyon om ahow> Glf'rl Canyon Dam al <br />Page, Arizona <br /> <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.