Laserfiche WebLink
<br />RECREATION DEVELOPMENTS <br /> <br /> <br />;'11"'1' iJf~ <br /> <br />~:..c.,~ <br />"",,,-V-y <br /> <br />S",<m'l"flg I~ ,,11 "'lr,,",,'ly POpulilr "'CO'<lIIO" on W,'jhWl'd\.l <br />B,'i\Ch "II L;t~p Pow.'11 <br /> <br />14 <br /> <br />DUring fiscal year 1977. Improvements and <br />addItions were made at several storage umts <br />and participating prOJects: <br /> <br />Units or Projects <br /> <br />Curecantl UOl!. Colorado <br />Access to Morrow Poml ReserVOir completed and lour boats purchased Park Servlce- <br />conducted tours of the spectacular reservOir to start In the summer of 1978 <br />NavajO Unl!. Colorado - New MexIco <br />ViSitor Centers al Arboles and Pine River were modifIed and prOVided with new <br />interpretive exhibits. <br />The dt.>sign package for the Navajo Dam lallwater area recreation development was <br />completed. <br />BostWick Park ProJect. Colorado <br />Silver Jack ReservOIr-Recreation facIlities desIgned by Forest Service, <br />Central Utah ProJect. Utah <br />Bonnevllle Unit-Strawberry ReservOir-Detailed site planning for Soldier Crf..>ek <br />recreation site completed <br />Currant Creek Reservoir-Access and Circulatory roads and parkmg constructed <br />San Juan-Chama ProJect. New Me:O:lco <br />Heron ReservOir-ViSitor Center and reSidence constructed. <br /> <br />RECREA TlON PLANNING <br /> <br />Plannmg tor recreation development contlOued <br />dUring the year. Investigations were underway <br />on the Ute Indian Unit, Central Utah ProJect. <br />Dominguez ReservOir ProJect. Grand Mesa <br />ProJect; Sublette ProJect; Uncompahgre Im~ <br />provement Project. and the Upper Colorado <br />Resource Study. <br />Advance planning lor recreation development <br />contlOued on the Anlmas-laPlata ProJect. the <br />UlOtah and Upalco Units 01 the Central Utah <br />PrOJect. and the West DIVIde PrOJect. <br />Conceptual development plans were com- <br />pleted lor the Upper StIllwater ReservOir, <br />Bonneville Unit. and Whiterocks ReservOir, <br />Uinlah Unit. of the Central Utah PrOJect. <br /> <br />OPERA TlONS <br /> <br />The Bureau 01 Reclamation now admlOlsters <br />recreahon facilities at lwo reservOirs 10 the <br />Colorado River Storage ProJect. <br />Facihties were constructed at Soldier Creek <br />ReservOir which are to be operated by the <br />Central Utah Project Provo office dUring the <br />years the reservOir is lilting to the level 01 the <br />e:O:lstlng Strawberry ReservOir Addlhonal <br />lacllltles Will be developed as the water level <br />reaches the conservation pool level Fontanelle <br />Reservoir IS administered by the Flaming <br />Gorge ottlce In Utah, <br />