Laserfiche WebLink
<br />,. . <br /> <br />form of sound insulation within the pumping plant and vegetation screening designed as part of <br />site landscaping. Ridges Basin specifications will provide for noise control, particularly relating to <br />golden eagle nesting. <br /> <br />3. Ensure that construction contractors schedule construction activities to avoid or minimize loud <br />activities in the vicinity of golden eagle nesting areas during the nesting season and that nesting <br />areas are "off limits" to construction forces and visitors. <br /> <br />4. R~quire that third-party developers of recreation facilities at Ridges Basin Reservoir <br />incorporate in a recreation developm~ntJmanagement plan the requirement to prohibit particularly <br />loud forms of watercraft and to include signing to advise people of eagl~ nesting sensitivity to <br />human presence and noise. <br /> <br />5. Ensure that developers and contractors associated with construction and operation of the non- <br />binding end uses incorporate methods to minimize noise disturbances. <br /> <br />Public Health and Safety <br /> <br />1. Ensur~ that public access to structural component construction areas will be controlled by <br />signage and by fencing around construction areas. <br /> <br />2. Ensure that contractors configure haul routes and access roads to prevent or discourage public <br />vehicular entry, including placement of signs warning against entry. <br /> <br />3. Ensure that all the potentially affected gas companies will be contacted prior to construction <br />crossings of gas pipelines which will be precisely located and appropriately marked in the field <br />and on the specifications. <br /> <br />4. Ensure that public access to end use and delivery system construction areas is controlled by <br />signage and by fencing around construction areas. <br /> <br />5. Investigate the potential for gas release due to man-made intrusions, prior to construction, and <br />will monitor excavations for the presence of coal bed methane gas. <br /> <br />6. Control public access to operation areas that could pose a threat to public safety. <br /> <br />7. Ensure that recreation area planning, final design of facilities, and reservoir access points are <br />developed to promote safety and use of accident management techniques. <br /> <br />10 <br />