My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03571
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03571
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:51:06 PM
Creation date
10/11/2006 11:49:55 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
9/25/2000
Title
Record of Decision - Animas-La Plata Project/Ute Indian Water Rights Settlement
Water Supply Pro - Doc Type
Record of Decision
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3. Ensure that areas to be disturbed are field surveyed prior to construction disturbance and will <br />ensure that construction monitoring is conducted where deemed appropriate. <br /> <br />4. Ensure that periodic shoreline monitoring is conducted as part of the facilities operations plan. <br /> <br />Agriculture <br /> <br />I. Location, design, and construction timing of the NNMP would protect agricultural lands. <br /> <br />Recreation <br /> <br />1. Pursue pumping regimes that reduce adverse flow effects on boating opportunities within the <br />Animas River when possible. <br /> <br />., Alter Durango Pumping Plant pumping regimes during periods of competitive events. <br /> <br />3. Acquire or provide funding (not to exceed $500,000) for the acquisition of public access at a <br />minimum of two points on the Animas River between the High Bridge and Basin Creek to reduce <br />effects to anglers on the Animas River. <br /> <br />Socioeconomics <br /> <br />No environmental commitments are made for socioeconomic resources. <br /> <br />Land Use <br /> <br />No environmental commitments are made for land use resources. <br /> <br />Hazardous Materials <br /> <br />I. Ensure that the Durango Pumping Plant is designed to minimize the disturbance of <br />contaminated materials. Reclamation will also ensure that procedures will be developed for <br />radiological monitoring of excavated soils and groundwater encountered and that remedial <br />procedures are planned in advance to counteract the potential for human exposure and for the <br />prevention of contaminated groundwater release from the construction site. <br /> <br />2. Ensure that all federal and state requirements pertaining to the management and handling of <br />hazardous materials, mixed wastes and radioactive waste are followed and will include those <br />requirements within construction contract language inclusive of construction safety and <br />environmental compliance. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.